My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RTA & Title Sheet - Century Center Kitchen Duct Replacement Proj No 125-060
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Request to Advertise
>
RTA & Title Sheet - Century Center Kitchen Duct Replacement Proj No 125-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:36:26 PM
Creation date
4/28/2026 2:36:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANADEPARTMENT OF PUBLIC WORKSPROJECTSEWERWATERTRAFFICSTREETOTHERCENTURY CENTERHOOD120 DR MARTIN LUTHER KING JR BLVDCITY PROJECT NUMBER 125-060APRIL 2026SHEET1 OF 37CITY OF SOUTH BEND, INDIANABOARD OF PUBLIC WORKSAPPROVED BY PUBLIC WORKS STAFFDATEElizabeth A. Maradik, PresidentJoseph R. Molnar, Vice PresidentMurray L. Miller, MemberAbigail E. Magas, MemberBreana N. Micou, MemberAttest: Hillary R. Horvath, ClerkTABLE OF CONTENTSPLANS PREPARED BY:JONES PETRIE RAFINSKI325 S. Lafayette Blvd.South Bend, IN 46601PLANS PREPARED BY:CITY OF SOUTH BENDENGINEERING DIVISION1316 COUNTY-CITY BUILDINGSouth Bend, IN 46601Edward J. Kowalczyk, AIA4/17/2026NAME Partick Sherman, PMP, DASM Director of Project ManagementNAMEScott Herczeg, Director of Operations, Century CenterNAMENifemi Oluwatomini, Senior EngineerG101 TITLE SHEET/DRAWING INDEXG201 LEGENDS AND NOTESD301 RIVER LEVEL DEMOLITION REFLECTED CEILING PLAND302 STREET LEVEL DEMOLITION REFLECTED CEILING PLANA100 OVERALL FLOOR PLANSA101 RIVER LEVEL FLOOR PLANSA102 STREET LEVEL FLOOR PLANA103 MEZZANINE LEVEL FLOOR PLANA104 ROOF PLANA301 RIVER LEVEL REFLECTED CEILING PLANA302 STREET LEVEL REFLECTED CEILING PLANM000 MECHANICAL COVERSHEETM101 STREET LEVEL HVAC DEMOLITION PLAN - PHASE 1M200 RIVER LEVEL HVAC PLAN - PHASE 1M201 STREET LEVEL HVAC PLAN - PHASE 1M203 ROOF HVAC PLAN - PHASE 1M300 RIVER LEVEL HVAC DEMOLITION PLAN - PHASE 2M301 STREET LEVEL HVAC DEMOLITION PLAN - PHASE 2M302 MEZZANINE LEVEL HVAC DEMOLITION PLAN - PHASE 2M400 RIVER LEVEL HVAC PLAN - PHASE 2M401 STREET LEVEL HVAC PLAN - PHASE 2M402 MEZZANINE LEVEL HVAC PLAN - PHASE 2M403 ROOF HVAC PLAN - PHASE 2M500 HVAC DETAILSM501 HVAC DIAGRAMSM502 KITCHEN HOOD DETAILSM503 KITCHEN HOOD DETAILSM600 HVAC SCHEDULESE000 ELECTRICAL COVERSHEETE101 STREET LEVEL ELECTRICAL DEMOLITION PLANE102 MEZZANINE LEVEL ELECTRICAL DEMOLITION PLANE200 RIVER LEVEL ELECTRICAL PLANE201 STREET LEVEL ELECTRICAL PLANE202 MEZZANINE LEVEL ELECTRICAL PLANE203 ROOF ELECTRICAL PLANE600 ELECTRICAL SCHEDULES <br />4/17/2026 11:52:02 AMEdward J Kowalczyk AIA4/NAMEAbigail Magas, PE , City Engineer4/17/20264/17/20264/17/202604/20/2026April 28, 2026
The URL can be used to link to this page
Your browser does not support the video tag.