Laserfiche WebLink
<br />PUBLIC WATER UTILITY DISTRIBUTION PIPING <br />2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 2 <br />2. AWWA C105 - Polyethylene Encasement for Ductile-Iron Pipe Systems. <br />3. AWWA C110 - Ductile-Iron and Gray-Iron Fittings. <br />4. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. <br />5. AWWA C115 - Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded <br />Flanges. <br />6. AWWA C151 - Ductile-Iron Pipe, Centrifugally Cast. <br />7. AWWA C153 - Ductile-Iron Compact Fittings. <br />8. AWWA C500 - Metal-Seated Gate Valves for Water Supply Service. <br />9. AWWA C600 - Installation of Ductile-Iron Mains and Their Appurtenances. <br />E. Manufacturers Standardization Society of the Valve and Fittings Industry: <br />1. MSS SP-60 - Connecting Flange Joints between Tapping Sleeves and Tapping Valves. <br />F. NSF International: <br />1. NSF 61 - Drinking Water System Components - Health Effects. <br />2. NSF 372 - Drinking Water System Components - Lead Content. <br />1.3 COORDINATION <br />A. Section 01 30 00 - Administrative Requirements: Requirements for coordination. <br />B. Coordinate Work of this Section with structure excavation and existing utilities. <br />1.4 PREINSTALLATION MEETINGS <br />A. Section 01 30 00 - Administrative Requirements: Requirements for preinstallation meeting. <br />B. Convene minimum one week prior to commencing Work of this Section. <br />1.5 SUBMITTALS <br />A. Section 01 33 00 - Submittal Procedures: Requirements for submittals. <br />B. Product Data: Submit manufacturer information regarding pipe materials, pipe fittings, valves, <br />valve boxes, and hydrants. <br />C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. <br />D. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections. <br />E. Preconstruction Photographs: Submit digital files of color photographs of Work areas and <br />material storage areas, as specified in Section 01 70 00 - Execution and Closeout Requirements. <br />F. Qualifications Statements: <br />1. Submit qualifications for manufacturer and installer.