Laserfiche WebLink
<br />AGGREGATES FOR EARTHWORK <br />2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 310516 - 3 <br /> <br />B. Stockpile in sufficient quantities to meet Project schedule and requirements. <br />C. Separate different aggregate materials with dividers or stockpile individually to prevent mixing. <br />D. Direct surface water away from stockpile site to prevent erosion or deterioration of materials. <br />E. Stockpile unsuitable materials on impervious material and cover to prevent erosion and <br />leaching, until disposed of. <br />3.2 STOCKPILE CLEANUP <br />A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent <br />freestanding surface water. <br />B. When borrow area is indicated, leave area in clean and neat condition. Grade site surface to <br />prevent freestanding surface water. <br />END OF SECTION 31 05 16 <br /> <br />