My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Change Orders
>
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:35:15 PM
Creation date
4/28/2026 2:34:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXECUTION AND CLOSEOUT REQUIREMENTS <br />2024.00254 – Madison Lifestyle District Phase I Utility Design Water Main Replacement <br />017000 - 8 <br />G. Fit Work tight to pipes, sleeves, ducts, conduits, and other penetrations through surfaces. <br />H. Maintain integrity of wall, ceiling, or floor construction; completely seal voids. <br />I. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for <br />assembly, refinish entire unit. <br />J. Identify hazardous substances or conditions exposed during the Work to Engineer for decision or remedy. <br />3.5 PROTECTING INSTALLED CONSTRUCTION <br />A. Protect installed Work and provide special protection where specified in individual Specification <br />Sections. <br />B. Provide temporary and removable protection for installed products. Control activity in immediate Work <br />area to prevent damage. <br />C. Prohibit traffic or storage upon waterproofed or roofed surfaces. When traffic or activity is necessary, <br />obtain recommendations for protection from waterproofing or roofing material manufacturer. <br />D. Prohibit traffic from landscaped areas. <br />3.6 FINAL CLEANING <br />A. Execute final cleaning prior to final Project assessment. <br />1. Employ experienced personnel or professional cleaning firm. <br />B. Clean Site; sweep paved areas, rake clean landscaped surfaces. <br />C. Remove waste and surplus materials, rubbish, and construction facilities from Site. <br />END OF SECTION 01 70 00
The URL can be used to link to this page
Your browser does not support the video tag.