My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Change Orders
>
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:35:15 PM
Creation date
4/28/2026 2:34:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />QUALITY REQUIREMENTS 014000 - 2 <br />1.4 REFERENCES <br />A. For products or workmanship specified by association, trade, or other consensus standards, <br />comply with requirements of standard except when more rigid requirements are specified or are <br />required by applicable codes. <br />B. Conform to reference standard by date of issue current as of date of Contract Documents except <br />where specific date is established by code. <br />C. Obtain copies of standards and maintain on Site when required by product Specification <br />Sections. <br />D. When requirements of indicated reference standards conflict with Contract Documents, request <br />clarification from Engineer before proceeding. <br />E. Neither contractual relationships, duties, or responsibilities of parties in Contract nor those of <br />Engineer shall be altered from Contract Documents by mention or inference in reference <br />documents. <br />1.5 TESTING AND INSPECTION SERVICES <br />A. Employ and pay for services of an independent testing agency or laboratory acceptable to <br />Owner to perform specified testing. <br />1. Before starting Work, submit testing laboratory name, address, and telephone number, <br />and names of full-time specialist and responsible officer. <br />2. Submit copy of report of laboratory facilities' inspection made by Materials Reference <br />Laboratory of National Bureau of Standards during most recent inspection, with <br />memorandum of remedies of deficiencies reported by inspection. <br />B. Independent firm will perform tests, inspections, and other services specified in individual <br />Specification Sections and as required by authorities having jurisdiction. <br />1. Laboratory: Authorized to operate in State of Indiana. <br />2. Laboratory Staff: Maintain full-time specialist on staff to review services. <br />3. Testing Equipment: Calibrated at reasonable intervals with devices of an accuracy <br />traceable to National Bureau of Standards or accepted values of natural physical <br />constants. <br />C. Testing, inspections, and source quality control may occur on or off Project Site. Perform off- <br />Site testing as required by Engineer or Owner. <br />D. Reports shall be submitted by independent firm to Engineer, Contractor, and authorities having <br />jurisdiction, indicating observations and results of tests and compliance or noncompliance with <br />Contract Documents. <br />1. Submit final report indicating correction of Work previously reported as noncompliant. <br />E. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, <br />storage, safe access, and assistance by incidental labor as requested.
The URL can be used to link to this page
Your browser does not support the video tag.