My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Change Orders
>
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:35:15 PM
Creation date
4/28/2026 2:34:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUBMITTAL PROCEDURES <br />202400254 Madsion Lifestyle District Phase I Utility Design Water Main Replacement 013300 - 3 <br />6. Receiver shall not hold Engineer responsible for such viruses or their consequences, and <br />shall hold Engineer harmless against costs, losses, or damage caused by presence of <br />computer virus in files or media. <br />1.7 SHOP DRAWINGS <br />A. Shop Drawings: Action Submittal: Submit to Engineer for assessing conformance with <br />information given and design concept expressed in Contract Documents. <br />B. Indicate special utility and electrical characteristics, utility connection requirements, and <br />location of utility outlets for service for functional equipment and appliances. <br />C. When required by individual Specification Sections, provide Shop Drawings signed and sealed <br />by a professional Engineer responsible for designing components shown on Shop Drawings. <br />1. Include signed and sealed calculations to support design. <br />2. Submit Shop Drawings and calculations in form suitable for submission to and approval <br />by authorities having jurisdiction. <br />3. Make revisions and provide additional information when required by authorities having <br />jurisdiction. <br />D. Submit electronic submittals via email as PDF electronic files. <br />E. After review, produce copies and distribute according to "Submittal Procedures" Article and for <br />record documents described in Section 017000 - Execution and Closeout Requirements and in <br />the City of South Bend Construction Standards & Specifications Section 1-10.2. <br />1. This document is available at https://southbendin.gov/wp- <br />content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf <br />1.8 OTHER SUBMITTALS <br />A. Informational Submittal: Submit data for Engineer's knowledge as Contract administrator or for <br />Owner. <br />B. Submit information for assessing conformance with information given and design concept <br />expressed in Contract Documents. <br />1.9 TEST REPORTS <br />A. Informational Submittal: Submit reports for Engineer's knowledge as Contract administrator or <br />for Owner. <br />B. Submit test reports for information for assessing conformance with information given and <br />design concept expressed in Contract Documents.
The URL can be used to link to this page
Your browser does not support the video tag.