My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - West Washington Mid-Block Proj No 124-070 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - West Washington Mid-Block Proj No 124-070 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:19:21 PM
Creation date
4/28/2026 2:19:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/27/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�pk tl1'ii-m� <br />QUOTE/PROPOSAL <br />CITY OF SOUTH BEND418rwa� <br />PROJECT NAME WEST WASHINGTON MID -BLOCK CROSSING <br />PROJECT NO. 124-U70 <br />QUOTES DUE 9am EDT - APRIL 28, 2026 to bpwbids(absouthbendin.gov <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Total Amount <br />1 <br />Common Excavation <br />45 <br />CYS <br />$114.00 <br />$5,130.00 <br />2 <br />HMA Surface Type B <br />(Tack Coat and Joint Adhesive Included) <br />14 <br />TON <br />$766.00 <br />$10,724.00 <br />3 <br />Asphalt Milling, 1.5 in. <br />162 <br />SYS <br />$59.00 <br />$9,568.00 <br />4 <br />PCCP, 10 in. <br />64 <br />SYS <br />$179.00 <br />$11,456.00 <br />5 <br />PCCP for Approaches, 6 in. <br />61 <br />SYS <br />$132.00 j <br />$8,052.00 <br />6 <br />Compacted Aggregate, No.53 <br />22 <br />TON <br />$121.00 <br />$2,662.00 <br />7 <br />Dense Graded Subbase <br />11 <br />CYS <br />$382.00 <br />$4,202.00 <br />8 <br />B Borrow <br />45 <br />CYS <br />$170.00 <br />$7,650.00 <br />11 <br />Concrete Curb Remove <br />132 <br />LFT <br />$31.00 <br />$4,092.00 <br />12 <br />Concrete Curb <br />158 <br />LFT <br />$71.00 <br />$11,218.00 <br />13 <br />Curb Ramp Concrete <br />39 <br />SYS <br />$350.00 <br />$13,650.00 <br />14 <br />Detectable Warning Surface <br />4 <br />SYS <br />$133.00 <br />$632.00 <br />15 <br />Concrete Remove <br />12 <br />SYS <br />$86.00 <br />$1,032.00 <br />16 <br />Tree Protection <br />1 <br />EA <br />$430.00 <br />$430.00 <br />17 <br />Nursery Sodding <br />254 <br />SYS <br />$25.01 <br />$6,352.54 <br />18 <br />Topsoil <br />29 <br />CYS <br />$107.46 <br />$3,116.34 <br />19 <br />Manhole Adjust to Grade <br />1 <br />EA <br />$788.00 <br />$788.00 <br />20 <br />Water Valve Adjust to Grade <br />1 <br />EA <br />$661.00 <br />$661.00 <br />21 <br />Casting Removal <br />2 <br />EA <br />$235.00 <br />$470.00 <br />22 <br />Casting, Furnish and Adjust to Grade <br />2 <br />EA <br />$1,295.00 <br />$2,690.00 <br />23 <br />12 in. Solid White Paint Line <br />72 <br />LFT <br />$5.98 <br />$430.56 <br />24 <br />6 in. Solid Yellow Paint Line <br />96 <br />LFT <br />$1.76 <br />$168.96 <br />25 <br />Pavement Message Marking, Multi- <br />Component, Raised Crosswalk Markin <br />2 <br />EA <br />$527.24 <br />$1,054.48 <br />26 <br />Transverse Marking, Multi -Component, <br />Crosswalk Line, White, 24 in. <br />40 <br />LFT <br />$9.99 <br />$399.60 <br />27 <br />Sign, Sheet, w/ Legend 0.080 in. <br />34 <br />SFT <br />$42.43 <br />$1,442.62 <br />28 <br />Sign Post, Square, Type 2, Unreinforced <br />Anchor Base <br />48 <br />LFT <br />$35.15 <br />$1,687.20 <br />35 <br />Inlet Protection <br />2 <br />EA <br />$492.00 <br />$994.00 <br />37 <br />Maintenance of Traffic <br />1 <br />LS <br />$15,000.00 <br />$15,000.00 <br />38 <br />Mobilization and Demobilization <br />1 <br />LS <br />$7,500.00 <br />$7,500.00 <br />Version 1/3/2025 Page -10 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.