Laserfiche WebLink
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME: WEST WASHINGTO N MID -BLOCK CROSSING <br />PROEJCT NO: 124-070 <br />QUOTES DUE: 9am EDT - APRIL 28. 2026 to b owbids southbendin. ov <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Common Excavation <br />45 <br />CYS <br />$ 275.00 <br />$ 12,375.00 <br />2 <br />HMA Surface Type B <br />(Tack Coat and Joint Adhesive Included) <br />14 <br />TON <br />$ 665.00 <br />$ 9,310.00 <br />3 <br />Asphalt Milling, 1.5 in. <br />162 <br />SYS <br />$ 50.00 <br />$ 8,100.00 <br />4 <br />PCCP, 10 in. <br />64 <br />SYS <br />$ 315.00 <br />$ 20,160.00 <br />5 <br />PCCP for Approaches, 6 in. <br />61 <br />SYS <br />$ 240.00 <br />$ 14,640.00 <br />6 <br />Compacted Aggregate, No. 53 <br />22 <br />TON <br />$ 92.00 <br />$ 2,024.00 <br />7 <br />Dense Graded Subbase <br />11 <br />CYS <br />$ 184.00 <br />$ 2,024.00 <br />8 <br />B Borrow <br />45 <br />CYS <br />$ 151.00 <br />$ 6,795.00 <br />11 <br />Concrete Curb Remove <br />132 <br />LFT <br />$ 25.00 <br />$ 3,300.00 <br />12 <br />Concrete Curb <br />158 <br />LFT <br />$ 70.00 <br />$ 11,060.00 <br />13 <br />Curb Ramp Concrete <br />39 <br />SYS <br />$ 265.00 <br />$ 10,335.00 <br />14 <br />Detectable Warning Surface <br />4 <br />SYS <br />$ 265.00 <br />$ 1,060.00 <br />15 <br />Concrete Remove <br />12 <br />SYS <br />$ 145.00 <br />$ 1,740.00 <br />16 <br />Tree Protection <br />1 <br />EA <br />$ 600.00 <br />$ 600.00 <br />17 <br />Nursery Sodding <br />254 <br />SYS <br />$ 33.00 <br />$ 8,382.00 <br />18 <br />Topsoil <br />29 <br />CYS <br />$ 220.00 <br />$ 6,380.00 <br />19 <br />Manhole Adjust to Grade <br />1 <br />EA <br />$ 2,650.00 <br />$ 2,650.00 <br />20 <br />Water Valve Adjust to Grade <br />1 <br />EA <br />$ 150.00 <br />$ 150.00 <br />21 <br />Casting Removal <br />2 <br />EA <br />$ 80.00 <br />$ 160.00 <br />22 <br />Casting, Furnish and Adjust to Grade <br />2 <br />EA <br />$ 1,250.00 <br />$ 21500.00 <br />23 <br />12 in. Solid White Paint Line <br />72 <br />LFT <br />$ 5.95 <br />$ 428.40 <br />24 <br />6 in. Solid Yellow Paint Line <br />96 <br />LFT <br />$ 1.75 <br />$ 168.00 <br />25 <br />Pavement Message Marking, Multi- <br />Component, Raised Crosswalk Marking <br />2 <br />EA <br />$ 525.00 <br />$ 1,050.00 <br />26 <br />Transverse Marking, Multi -Component, Crosswalk <br />Line White 24 in. <br />40 <br />LFT <br />$ 9 95 <br />$ 398.00 <br />27 <br />Sign, Sheet, w/ Legend 0.080 in. <br />34 <br />SFT <br />$ 29.60 <br />$ 1,006.40 <br />28 <br />Sign Post, Square, Type 2, Unreinforced Anchor <br />Base <br />48 <br />LFT <br />$ 18.90 <br />$ 907.20 <br />35 <br />Inlet Protection <br />2 <br />EA <br />$ 250.00 <br />$ 500.00 <br />37 <br />Maintenance of Traffic <br />1 <br />LS <br />$ 18,500.00 <br />$ 18,500.00 <br />38 <br />Mobilization and Demobilization <br />1 <br />LS <br />$ 3,200.00 <br />$ 3,200.00 <br />Total Amount of Quote $ 149,903.00 <br />Firm: Milestone Contractors. L.P. <br />Address: 24358 SR 23 <br />City/State/Zip: South Bend, IN 46614 Telephone Number: 574 288-4811 <br />Fax Number: 574 5717 <br />By. r <br />i (Signature) <br />Dustin P. N. Director of Estimating, Griffith -South Bend <br />(Printed Name of Person Signing) <br />