Laserfiche WebLink
3. SULFUR DIOXIDE <br />A. GENERAL <br />i. Sulfur quotes should be deposit -free. No cylinder deposit should be <br />included in the quote. <br />ii. All bid prices must be honored for no less than 4 months, even in <br />force majeure conditions. <br />B. PROPERTIES <br />Bonin Point <br />-10°C <br />Color <br />Colorless <br />Specific Gravity <br />80°F <br />1.363 <br />Critical Tern314.82°F <br />Critical Pressure <br />1141.5PSIA <br />C. USAGE <br />i. Estimated <br />annual usage is <br />100 tons, more <br />or <br />less, to be delivered <br />in 2,000 Ib <br />containers <br />of liquid S02 in <br />truckload lots <br />of <br />10 containers. <br />D. DELIVERY <br />i. Supplier must be able to guarantee delivery of up to 8 tons (20,000 Ibs) within <br />three (3) to five (5) calendar• days from release of requirement. <br />ii. Material to be delivered F.O.B. <br />iii. No freight surcharges allowed. <br />iv. Billing must be submitted on a CWT unit basis. <br />v. Delivery Location: Wastewater Treatment Plant located at 3113 Riverside <br />Drive, South Bend, Indiana 46628. <br />