Laserfiche WebLink
5. Vendor personnel shall not unload any filled cylinders or Lou containers prior <br />to live inspection by South Bend Wastewater personnel. <br />6. Vendor personnel shall assist out Bend personnel in the visual inspection of <br />each ton container for: <br />n) E.rternal dmm�ge or defect <br />h) Proper installation of valve protection housing or caps <br />c) Visual inspection of valves and fusible plugs <br />i) All old wire from previous hung tags are to be removed prior to delivery <br />ii) All fusible plugs should be defect free (no pits orholes ) <br />d.) Determination of markings o/fretest and recertification <br />7. Wastewater facility has overhead crane for offloading ton containers. <br />