My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Veteran's Memorial Park Twyckenham Sidwalk 125-077 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - Veteran's Memorial Park Twyckenham Sidwalk 125-077 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:12:23 PM
Creation date
4/28/2026 2:11:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/27/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10. As -Built drawings shall be included in the cost of the Construction Engineering. <br />11. Construction Engineering will not be paid for directly but shall be considered incidental to the <br />Contract. <br />XXII. TEMPORARY EROSION CONTROL <br />A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 205 <br />B. Additions: <br />1. The Contractor shall be responsible for adhering to the City of South Bend specifications and <br />requirements regarding erosion and sedimentation control. Temporary Erosion Control shall <br />include the cost implementation of the plan and maintenance of the erosion control elements. <br />Should the Contractor fail to comply with the requirements of the Erosion Control Plan or fail to <br />adequately implement or maintain the elements of the plan, the Contractor shall be solely <br />responsible for fines, imprisonment or any other penalties lawfully imposed. <br />2. The Contractor shall be responsible for erosion control measures and keeping the sedimentation <br />on site. Measures include but are not limited to installing silt fence where the ground slopes away <br />from the project site, installing inlet protection as necessary to keep sediment out of inlets during <br />construction, installing gravel pads or other necessary measures to prevent tracking sediment <br />offsite. <br />3. The contractor shall vegetate all areas that lay bare for more than fourteen (14) days with <br />temporary seeding. The contractor shall inspect all erosion control measures a minimum of once <br />per week, and within 24 hours after every rainfall event of %" or more. The Contractor shall take <br />corrective measures as necessary and maintain all temporary erosion control measures. <br />4. The posting of site information by 327 IAC 15-5-7(b)(6) on the project and written records shall be <br />available for review within 48 hours of a request for information. <br />5. All maintenance and monitoring of erosion control measures will not be paid for separately but <br />shall be included in the cost of the contract item Temporary Erosion Control. <br />6. Temporary Erosion Control will include all other items not paid for separately and will be paid for <br />at the unit price set forth in the proposal. <br />XXIII. CLEARING RIGHT OF WAY <br />A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 201 & 202 <br />B. Additions: <br />1. This work shall be paid for at the Lump Sum Unit Price established in the Proposal for the line item <br />Clearing Right of Way. Existing stump removal within the construction limits will not be paid for <br />separately but shall be included in the cost of Clearing Right of Way. <br />2. All items required to be removed for the proper execution of the Work and not paid for otherwise, <br />shall be included in the cost of Clearing Right of Way. <br />3. No stockpiling of removed material that is intended to be removed from the site shall be allowed to <br />remain in right-of-way overnight. <br />4. Clearing Right of Way will be paid for on a lump sum basis under the bid item set forth in the <br />proposal. <br />XXIV. TREE, REMOVE <br />A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 201 <br />B. Additions: <br />1. All work on trees and stumps in City right of way shall be done by a Licensed Arborist registered <br />with the South Bend Board of Park Commissioners. The Contractor shall provide the Licensed <br />Arborist. The cost associated with providing a Licensed Arborist shall be included in this item. Any <br />subcontractor must comply with all requirements of the Prevailing Specifications, General <br />Conditions, and Special Provisions for this work. <br />Version 9/1/2025 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.