My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Veteran's Memorial Park Twyckenham Sidwalk 125-077 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - Veteran's Memorial Park Twyckenham Sidwalk 125-077 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:12:23 PM
Creation date
4/28/2026 2:11:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/27/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tree trunks for injury, improper pruning, and insect infestation and take proper corrective <br />measures. Start wrap at the ground and cover the trunk to height of the first branches and <br />securely attach to the trunk using biodegradable tape suitable for nursery use. Tape shall be <br />loosely wrapped around the wrapping material in a single layer to permit its breakdown and <br />unrestricted tree growth of 1 inch. All wrap/tape shall be removed from tree in one year as part of <br />maintenance. <br />21. Warrant and maintain materials for a period of two (2) years from the date of substantial <br />completion. Defects resulting from neglect by the Owner, abuse or damage by others, or unusual <br />phenomena or incidents beyond the Contractor's control are exempt. Should questions arise <br />concerning the responsibility of replacement, the Engineer shall be the sole judge of the need for <br />replacement. Replace plantings at no additional cost to the owner. <br />22. Planting Mix, Fertilizer, Herbicide, Tree Wrap, Aggregate, Treegator Bags, Mulch, Edging, and <br />Water will not be paid for directly but shall be included in the cost of the planting. <br />23, Begin maintenance immediately after planting. Maintenance during planting season will not be <br />paid for directly but shall be included in the cost of the planting. <br />24. Planting will be paid for by the number of units of each plant specified, installed, and accepted at <br />the unit price set forth in the contract. <br />XXXIV. TURF REINFORCEMENT MAT <br />A. Prevailing Specifications: Manufacturer's Recommendations <br />B. Additions: <br />1. Work shall include all material, delivery, workmanship, and installation required to install Turf <br />Reinforcement Mat as shown in the plans <br />2. Turf Reinforcement Mat (TRM) shall be ShearForcel0 Hybrid Turf Instant Armor Mat as <br />manufactured by GrassWorx or approved equal. <br />3. TRM shall be installed in accordance with manufacturer's instructions. <br />4. TRM shall be rolled in the direction of the water flow and properly fastened and overlapped with the <br />adjacent mat. <br />5. Turf Reinforcement Mat will be measured by the square yard of mat that is properly installed. <br />6. Payment for Turf Reinforcement Mat will be paid for at the contract unit price as set forth in the <br />proposal. <br />Version 9/1/2025 Page - 14 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.