Laserfiche WebLink
<br /> <br />O w n e r ’ s I n i t i a l s _________ <br />P a g e | 7 <br /> <br /> <br /> <br />Electrical <br /> <br />Our licensed electrician will do the following electrical work: <br /> <br />1st Floor <br /> Install new exterior coach light at kitchen door as well as laundry room <br />door. <br /> Install outside GFCI outlets as needed <br /> <br />Insulation <br /> <br />R-value is based on wall thickness. Supply and install the following: <br /> <br /> Foam around all openings and jambs <br /> Foam around any cracks in the siding or in box sills <br /> Foam around wire and plumbing holes in top and bottom plates and <br />exterior wall partitions <br /> Foam full being electrical boxes. If wall is 2x6 foam where wires enter <br />the electrical box <br /> Caulk plates, narrow headers and all gap areas as needed <br /> Install 6”x16” foam air deflectors at eaves of the addition <br /> Install R-19 kraft faced fiberglass batts in the exterior walls of <br />addition <br /> Install R-19 fiberglass batts in basement box sills and/or between <br />floor box sills of addition <br /> Install R-10 4’ MBI on the addition crawlspace walls <br /> Install R-38 kraft faced fiberglass batts in the un-blowable ceiling of <br />the addition <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />