Laserfiche WebLink
4) Grinding, repair, & installation of polyurea coating to remedy previously done repairs that were <br />performed incorrectly. New coating ensures proper traction, UV protection, flexion for expansion & <br />contraction, as well as a significant improvement in color matching to the existing limestone. <br />5) Replacement in kind of 5 sections of concrete sidewalks along the west side of the main entrance. <br />Repairs in kind include a trowel finish concrete. <br />6) Various tuckpointing repairs around main entrance and along stairs to lower patio along the north side <br />of the building. Repairs to be done in kind including tinting and finishing in accordance with original <br />installation methods. <br />7) Repairs of various stone caps along north and east sides of building. Grinding, mortar replacement, and <br />sealing to be done as needed. Repairs to be done in kind to preserve original look of exterior as well as <br />prevent further water penetration and future damage. <br />8) Repair of column at southwest corner of exterior (just outside sun room). Repair to be made with color <br />matched epoxy including sand to match color and texture. Repair to restore original look of building while <br />preventing further damage caused by water intrusion. <br />9) Cleaning and sealing of damaged limestone walls underneath overhang for carriage drop. Damage was <br />caused by previous roof leak that was repaired in 2024. Masonry repair to protect existing structure and <br />prevent further damage. <br />10) Repair as needed stone wall cap along west side of building where railing attaches. Cleaning, crack <br />filling, stone repair, and sealing to be completed to prevent further damage. <br />11) Stone column restoration at northeast corner of property. Loose stone column to be returned to its <br />originally installed location, secured, and cap reinstalled in kind with original look of proper ty. Includes <br />grinding and tuckpointing in kind as necessary. <br />12) Removal, sand blasting, repair, & powder coating (matte black finish) of existing, non-historic fire <br />escape landing, staircase, & handrail. Temporary replacement to be built of treated lumber while repairs <br />are being made to metal items. Temporary installation methods will be restricted to no additional building <br />penetrations beyond current penetrations utilized for metal staircase. <br />Specification of Material via <br />Manufacture Brochure:PDF Indiana Geologica….pdf <br />PDF Innovative Space….pdf <br />PDF Indiana Limeston….pdf <br />PDF Innovative Space….pdf <br />PDF Innovative Space….pdf <br />4