Laserfiche WebLink
Project Number:1024092688 <br />Project Name:Basney BMW Watermain Extension <br />Project Location:US33 & CR40 Sewer and Water Extension <br />Date:5/22/2025 <br />Engineer's Opinion of Probable Construction Costs <br />City portion only <br />NO. ITEM UNIT QUANTITY UNIT COST TOTAL <br />Water Main, <br />Lateral, and <br />Fittings <br />1 Mob/demob each 1 $5,000.00 $5,000.00 <br />2 Traffic Control for LaSalle Trail lump 1 $6,500.00 $6,500.00 <br />3 12" DI Watermain, installed ln.ft.693 $130.00 $90,090.00 <br />4 Fire Hydrant Assembly w/ Aux. Valve, installed each 1 $8,865.00 $8,865.00 <br />5 12" DI gate valve, installed each 1 $5,375.00 $5,375.00 <br />6 12"x12"x8" DI Tee, installed each 2 $2,335.00 $4,670.00 <br />Sub Total $120,500.00 <br />Total $120,500.00