My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Main Line Extension Agreement Proj No DP25-006 - Basney Enterprises
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Water Main Line Extension Agreement Proj No DP25-006 - Basney Enterprises
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 12:17:49 PM
Creation date
6/24/2025 12:17:28 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Number:1024092688 <br />Project Name:Basney BMW Watermain Extension <br />Project Location:US33 & CR40 Sewer and Water Extension <br />Date:5/22/2025 <br />Engineer's Opinion of Probable Construction Costs <br />City portion only <br />NO. ITEM UNIT QUANTITY UNIT COST TOTAL <br />Water Main, <br />Lateral, and <br />Fittings <br />1 Mob/demob each 1 $5,000.00 $5,000.00 <br />2 Traffic Control for LaSalle Trail lump 1 $6,500.00 $6,500.00 <br />3 12" DI Watermain, installed ln.ft.693 $130.00 $90,090.00 <br />4 Fire Hydrant Assembly w/ Aux. Valve, installed each 1 $8,865.00 $8,865.00 <br />5 12" DI gate valve, installed each 1 $5,375.00 $5,375.00 <br />6 12"x12"x8" DI Tee, installed each 2 $2,335.00 $4,670.00 <br />Sub Total $120,500.00 <br />Total $120,500.00
The URL can be used to link to this page
Your browser does not support the video tag.