DEPARTMENT OF PUBLIC WORKS
<br />DIVISION OF ENGINEERING
<br />PAYMENT APPLICATION
<br />QUANTITY UNIT UNIT PRICE EXTENSION
<br />No.Description Contract This Est Total Dols. Cent Dols. Cent
<br />Deductions Total
<br />$26,048.29
<br />Approved
<br />_________________________________________
<br />Construction Manager - Kyle Ludlow
<br />______________
<br />Date
<br />_________________________________________
<br />Contractor
<br />______________
<br />Date
<br />Contractor: Milestone Contractors, L.P.4 (Final)
<br />124-008
<br />Work Completed from 5/31/2025 to Final
<br />Leeper Ave. Bridge Repairs
<br />Deck Replacement
<br />1 MOBILIZATION AND DEMOBILIZATION 1 0 1 LS $24,300.00 $24,300.00
<br />2
<br />PRESENT STRUCTURE, REMOVE
<br />PORTION, STRUCTURE 1 0 1 LS $48,000.00 $48,000.00
<br />3 FENCE, CHAIN LINK, REMOVE 423 0 423 LFT $10.00 $4,230.00
<br />4 EXCEVATION, COMMON 6 0 6 CYS $200.00 $1,200.00
<br />5 SUBGRADE TREATMENT, TYPE III 44 0 68.5 SYS $15.00 $1,027.50
<br />6 COMPACTED AGGREGATE, NO. 53 8 0 11.67 CYS $275.00 $3,209.25
<br />7 SIDEWALK, 6 IN. REINFORCED 44 0 68.5 SYS $250.00 $17,125.00
<br />8
<br />FENCE, CHAIN LINK, 42 IN., GROUND
<br />MOUNTED 184 0 192 LFT $64.00 $12,288.00
<br />9
<br />FENCE, CHAIN LINK, 42 IN., BRIDGE
<br />MOUNTED 240 0 232 LFT $103.00 $23,896.00
<br />10 CLEAN STEEL BRIDGE, PARTIAL, QP-2 1 0 1 LS $35,000.00 $35,000.00
<br />11
<br />DISPOSAL OF CLEANING WASTE
<br />HAZARDOUS 1 0 1 LS $500.00 $500.00
<br />12 PAINT STEEL BRIDGE, PARTIAL 1 0 1 LS $12,500.00 $12,500.00
<br />13
<br />GRATES, BASINS, AND FITTINGS, CAST
<br />IRON 1 0 1 EA $4,600.00 $4,600.00
<br />14 FIELD DRILLED HOLE IN CONCRETE 10 0 10 EA $65.00 $650.00
<br />15 REINFORCING BARS, EPOXY COATED 14027 0 14027 LB $2.30 $32,262.10
<br />16 CONCRETE, C, SUPERSTRUCTURE 32.7 0 32.7 CYS $5,900.00 $192,930.00
<br />17 PATCHING CONCRETE STRUCTURES 50 0 0 SFT $24.00 $0.00
<br />18 STRUCTURAL STEEL 1 0 1 LS $40,000.00 $40,000.00
<br />19 PIPE, BRIDGE DECK DRAIN SYSTEM 1 0 1 LS $13,600.00 $13,600.00
<br />20 MAINTAINING TRAFFIC 1 0 1 LS $15,000.00 $15,000.00
<br />21 REMOVE AND RESET ELECTRIC UTILITY 1 0 1 LS $6,000.00 $6,000.00
<br />22 DECK DRAINAGE SPLASHPAD 1 0 1 LS $4,000.00 $4,000.00
<br />23
<br />CO1 Additional concrete and aggregate to
<br />extend trail 1 0 0 EA $7,134.25 $0.00
<br />24 CO2 - Milling 2" Asphalt and Clean 904 0 904 SY $12.00 $10,848.00
<br />25 CO2 - HMA Surface 2" with tack 100 0 100 TON $178.00 $17,800.00
<br />$520,965.85
<br />Deductions $0.00
<br />Retainage $0.00 Sub Total $520,965.85
<br />Liq.Dam.$0.00 Prev. Pmts $494,917.56
<br />$0.00
<br />Application No
<br />Project No.
<br />Project Name:
<br />AMOUNT DUE
<br />6/03/2025
|