Laserfiche WebLink
INDIANA <br />EARTH <br />INC. <br />Page 2 of 2 <br />NOTES: <br />1: Engineering (field staking, compaction testing & soil testing) by others. <br />2: This quote does not include removal or replacement of unsuitable soils, discovery of contaminates, <br />asbestos, freon, rubble or concrete: or dewatering unless noted: or shoring unless noted. <br />3: Any work performed and not specifically listed in this quote will be billed as extra charges. <br />4: Any and all Permits, Taps & Fees are not included unless otherwise specified in the bid proposal. <br />5: This quote does not include any Asphalt, Concrete Paving or Concrete Sidewalks unless noted. <br />6: The cost for materials can be subject to a change if the award is delayed beyond 30 days. <br />7: All materials generated from a Demolition Contract become the property of Indiana Earth, Inc. for <br />possible salvage. Any materials removed after the submitted bid, the lost revenue can be subject to a <br />back charge. Any and all wood, debris, trash, furniture, etc. not limited to contaminates and oil containers, etc. placed on, <br />in or around building(s) or project after work is quoted will be the responsibility of owner to remove. <br />8: No thicken slab work unless noted. <br />9: Winter protection not included. <br />10: Driving of Sheeting: Indiana Earth will not be responsible if sheeting is close to any Utilities which can be damaged by <br />Vibration or Undermining which can cause settlement and breakage of the Utility. <br />11: Sheeting: If sheeting is required next to any buildings or structures, Indiana Earth is not responsible for any damage <br />to said structures or buildings. <br />12: If sheeting is required, ample room must be made available for the necessary equipment at no additional cost to <br />Indiana Earth. <br />13: Dewatering, if included, Indiana Earth must be able to discharge water without any additional incurred expense. <br />14: Costs for a bond, if required, is not included unless noted. <br />15: Barricading is not included unless noted. <br />16: Customers agree not to discuss, entice or approach our employees about employment opportunities, starting a <br />business together and agree not to offer gifts (including monetary gifts) to our employees. <br />17: No soil stabilization of any kind or chemical modifications to be included unless noted in proposal. <br />18: Spreading of topsoil is roughed in and your landscaper must tractor grade all areas to get final finish. <br />19: Availability of materials from suppliers may lead to delays affecting the project schedule and we will not be liable for <br />liquidated damages due to material shortages beyond our control. If materials are not readily available due to <br />uncontrollable market situations Indiana Earth, Inc. cannot be held responsible. <br />20: Any material cost increases could be added to quote if delay beyond 30 days on decision for proceeding with our <br />proposal. <br />21: Due to market fluctuations Indiana Earth cannot guarantee material prices and will have to pass on price increases <br />subjected by the manufacturers and suppliers. <br />22: If this proposal is accepted then the proposal and notes must be a part of the contract. <br />23: All grading, sub -grading of topsoil, stone, etc to within 1/10' of a foot. (1.25"), unless we have noted otherwise. <br />24: No topsoil import or topsoil placement unless noted. <br />QUOTE GOOD FOR THIRTY (30) DAYS. <br />REVISED 5/14/2023 <br />10343 McKinley Hwy. • Osceola, IN 46561 • (574) 674-6488 • FAX (574) 674-6480 <br />