My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1. 917 Leland Avenue_COA 2025-0513 PACKET
sbend
>
Public
>
Historic Preservation
>
2025
>
June
>
1. 917 Leland Avenue_COA 2025-0513 PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2025 8:42:29 AM
Creation date
6/11/2025 10:09:33 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
917 Leland Avenue
HPC Document Type
Certification
HPC Local Historic District
ix. Chapin Park
Rectangle
ID:
1
Creator:
Created:
6/11/2025 10:09 AM
Modified:
6/10/2025 1:57 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#Services Qty Price Total <br />To Reinforce the roof with waterproofed roofing seal. To address any obstructions protruding through the <br />roof, seams along sidewalls, and any other various areas areas on the roof that would require reinforcing. <br />12 Asphalt Rf(m) - Smart Plug 1.00 $0.00 $0.00 <br />Quality plug that makes converting from static vents to ridge ventilation products faster and stronger than <br />other methods. Made of heavy-duty 24 gauge galvanized steel with a reinforced backside that can hold <br />more than 700 lbs. <br />13 Asphalt Rf(l) - Professional Installation of Complete New Roofing <br />System <br />26.00 $550.00 $14,300.00 <br />This covers installation of up to (2) sheets of decking to replace any rotted wood in the deck. Then laying <br />down ice, and water shield, (90lb) synthetic felt, starter strip, drip edge, and shingles starting from the eves <br />and working our way back to the ridge. Where we will install a ridge vent, with cap to complete your roof if <br />applicable. <br />Followed by a thorough cleanup and disposal of debris. <br />* The final price could change, if new decking is needed to get the roof up to code, once a complete tear off <br />is done. <br />** With out the new pitch on the roof, the final size of the roof could become slightly larger than accounted <br />for so that could change the final price as well. <br />#Products Qty Price Total <br />14 Dumpster (20yd)1.00 $500.00 $500.00 <br />Cost to load and haul away old materials, installation waste and associated debris for up to (4tons). <br />If the debris goes over on weight it's an extra $40 per ton. <br />Subtotal $16,100.00 <br />Grand Total ($)$16,100.00 <br />Deposit Due $9,660.00 <br />Payment Schedule <br />Deposit (60.00%)$9,660.00 <br />Accepted payment methods <br />Credit Card, Check, Cash, PayPal <br />Message <br />I would be happy to have an opportunity to work with you. <br />For projects over $20,000, a draw schedule will be in place of a 50% due upon acceptance of estimate and prior <br />to scheduling of work, 25% due on the day work begins, and the balance of the contract due the day of project <br />completion unless otherwise agreed upon in writing by project consultant and customer. <br />Terms <br />10
The URL can be used to link to this page
Your browser does not support the video tag.