Laserfiche WebLink
St. Joseph County/South Bend <br />Marion Court Residential Development <br />Right of Way Work <br />Description Quantity Unit Unit Price Cost <br />1.Common Excavation 130 CYD $20.00 $2,600 <br />2.Tree, Remove 4 EA $1,500.00 $6,000 <br />3.4" Concrete Sidewalk 100 SYD $65.00 $6,500 <br />4.Concrete Curb, Remove 35 LFT $15.00 $525 <br />5.8" Concrete Drive Approach 30 SYD $120.00 $3,600 <br />5.Compacted Aggregate, No. 53 20 TON $40.00 $800 <br />6.HMA Surface, 165 lb/syd 3 TON $110.00 $330 <br />7.HMA Intermediate, 275 lb/syd 4 TON $105.00 $420 <br />8.HMA Base, 440 lb/syd 7 TON $90.00 $630 <br />9.Concrete Curb 35 LFT $40.00 $1,400 <br />10.Mulched Seeding, Type U 300 SYD $3.00 $900 <br />11.Sanitary Sewer Manhole, 48"1 EA $5,500.00 $5,500 <br />12.Sanitary Sewer Pipe, 8"165 LFT $55.00 $9,075 <br />13.Connect to Structure 2 EA $1,000.00 $2,000 <br />14.8' DIP Water Main 28 LFT $130.00 $3,640 <br />15.Tapping Sleeve and Valve, 8" x 16"1 EA $12,000.00 $12,000 <br />Total:$55,920 <br />Bond Amount 125% of Total TOTAL:$70,000 <br />Marion Right of Way Construction Estimate <br />May 15, 2025 <br />Page 1 of 1