My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ratify Emergency Repair - Edison Lift Station - GE Marshall Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Ratify Emergency Repair - Edison Lift Station - GE Marshall Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:02:30 PM
Creation date
6/10/2025 12:02:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER-OFFICE MEMORANDUM <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk of the Board of Public Works <br />FROM: Becca Plantz, PE, Assistant City Engineer <br />SUBJECT: Ratify Emergency Work <br />Emergency Sewer and Lift Station Repair at Edison Road <br />DATE: June 2, 2025 <br />The Division of Engineering, Division of Wastewater, and Division of Streets & Sewers requests <br />the Board of Public Works approval and ratification of an emergency purchase order contract with <br />GE Marshall, Inc. for sanitary sewer pipe replacement. <br />This emergency work was identified by the Division of Wastewater when the lift station <br />experienced operational issues that required immediate intervention to restore service and ensure <br />continued wastewater conveyance. The pumps and wet well were found to be accumulating sand <br />and debris, indicating a potential break in the upstream section. A break was found in the top of <br />the upstream gravity sewer connecting the northern section to the lift station after bypassing the <br />lift station and clearing sand. <br />GE Marshall was contracted on a time and materials basis for the emergency repair work after <br />contacting additional contractors about availability. Excavation of the pipe segment included the <br />full width of the road, dewatering, and continuous bypass operations to expose the break and <br />replace the pipe. Additional break down of work completed by GE Marshall is attached. <br />Total Emergency Repair Cost from GE Marshall: $95,323.04 <br />Emergency Purchase Order PO-35035 was paid through Sewage Works Operations. <br />Please call with your questions 5998. <br />June 10, 2025
The URL can be used to link to this page
Your browser does not support the video tag.