My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Mayflower Rd Reconstruction Proj No 125-037 - JQOL Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Mayflower Rd Reconstruction Proj No 125-037 - JQOL Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:58 PM
Creation date
6/10/2025 12:01:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 4 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />4. Perform or provide the following additional Final Design Phase tasks or deliverables: <br />[here list any such tasks or deliverables] <br />5. Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documents. Within 7 days of <br />receipt, Owner shall submit to Engineer any comments and, subject to the provisions of <br />Paragraph 6.01.G, instructions for revisions. <br />6. Revise the bidding documents in accordance with comments and instructions from the <br />Owner, as appropriate, and submit electronic final copies of the bidding documents, a <br />revised opinion of probable Construction Cost, and any other deliverables to Owner within <br />7 calendar days after receipt of Owner’s comments and instructions. <br />B. Engineer’s services under the Final Design Phase will be considered complete on the date when the <br />submittals required by Paragraph A1.03.A.6 have been delivered to Owner. <br />C. In the event that the Work designed or specified by Engineer is to be performed or furnished under <br />more than one prime contract, or if Engineer’s services are to be separately sequenced with the <br />work of one or more prime Contractors (such as in the case of fast-tracking), Owner and Engineer <br />shall, prior to commencement of the Final Design Phase, develop a schedule for performance of <br />Engineer’s services during the Final Design, Bidding or Negotiating, Construction, and Post- <br />Construction Phases in order to sequence and coordinate properly such services as are applicable to <br />the work under such separate prime contracts. This schedule is to be prepared and included in or <br />become an amendment to Exhibit A whether or not the work under such contracts is to proceed <br />concurrently. <br />D. The number of prime contracts for Work designed or specified by Engineer upon which the <br />Engineer’s compensation has been established under this Agreement is 1 . If more prime <br />contracts are awarded, Engineer shall be entitled to an equitable increase in its compensation under <br />this Agreement. <br />PART 2 – ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner’s Written Authorization <br /> <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed below. <br />1. Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for private or governmental grants, loans, or advances in connection with <br />the Project; preparation or review of environmental assessments and impact statements; <br />review and evaluation of the effects on the design requirements for the Project of any such <br />statements and documents prepared by others; and assistance in obtaining approvals of <br />authorities having jurisdiction over the anticipated environmental impact of the Project. <br />2. Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other information furnished by Owner or others.
The URL can be used to link to this page
Your browser does not support the video tag.