My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Concrete Repair Agreement - Ziolkowski Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Concrete Repair Agreement - Ziolkowski Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:37 PM
Creation date
6/10/2025 12:01:34 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> <br />any required mobilization with the adjacent property owners. Notwithstanding any breach of <br />Contractor’s duty to perform the repair to the Alleged Defects in a manner that conforms to the <br />concrete specifications, Contractor shall only have the obligation to repair the Alleged Defects <br />one time. All future maintenance, and repair and warranty work to the concrete in the areas <br />identified in the American StructurePoint October 29, 2024 Report and the Alleged Defects after <br />this one-time corrective action shall be a City expense. <br /> 2. Contractor agrees to perform the work necessary to repair the Alleged Defects in <br />the areas identified in the American StrucurePoint October 29, 2024 Report in Areas C, D and E <br />in a timely manner no later than June 30, 2025, and in Areas A and B promptly after completion <br />of Areas C, D and E. Contractor will be fully demobilized from Areas C, D and E by June 30, <br />2025. <br /> 3. The Parties agree that all other warranties and performance bonds associated with <br />the Project will remain in place, consistent with applicable State law. <br /> 4. The City agrees that the Project has been substantially completed by Contractor <br />and the City shall ensure that all remaining pay applications, if submitted, and retainage have <br />been properly processed and released for the benefit of Contractor. <br /> <br />5. The City, or a designee of the City’s choosing, reserves the right to inspect the <br />repair work at any time. The City, or its designee, shall conduct inspections promptly upon <br />notification from Contractor that each Phase of the repair work to the Alleged Defects has been <br />completed. The City Engineer, or a designee shall provide Contractor with a letter stating whether <br />the repairs have been completed to the satisfaction of the City promptly upon completion of each <br />Phase. If any deficiencies are noted, the City Engineer, or a designee, will provide written notice <br />to Contractor detailing the deficiencies and the parties will jointly reconvene to determine a <br />mutually agreeable solution.. <br /> 6. To the extent necessary, Contractor, at its sole cost and expense, shall obtain all <br />required licenses and permits.
The URL can be used to link to this page
Your browser does not support the video tag.