Laserfiche WebLink
Page 2 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />g. Prepare IDNR Hydraulic Modeling Checklist in support of CIF Permit <br />Application. <br />h. Perform scour computations <br />i. Design scour countermeasures <br />j. Prepare hydraulic report <br />3. Update hydraulics calculations and report to account for Federal Emergency <br />Management Agency (FEMA) flood height “No-Rise” requirements. <br /> <br />Item A1.05 is deleted and reinserted as follows: <br />A1.05 SERVICES NOT BEING PERFORMED BY ENGINEER UNDER THIS <br />AGREEMENT <br /> Any services not specifically included above are not included in <br />Engineer’s Scope of Services being provided under this Agreement. The services <br />not being provided under this Agreement include, but are not limited to, the <br />following: <br />1. Geotechnical Investigation and Report <br />2. Permitting <br />3. Utility Coordination Services <br />4. Environmental Services <br />5. Administering, and/or attending an informal public information meeting <br />6. Prepare for, advertise, administer, and attend a public hearing <br />7. Right-of-Way Engineering <br />8. Right-of-Way Acquisition Services <br />9. Providing any type of property surveys and staking to enable contractor(s) <br />to proceed with their work; and providing other special field surveys <br />10. Construction Inspection Services <br />11. Construction Phase Office Services <br />12. Bridge Design <br />13. Roadway Design <br />14. Preparation of plans in accordance with INDOT requirements for a <br />federally funded project <br />15. Stream and wetland mitigation <br />16. Floodway habitat mitigation services <br />17. NEPA Documentation <br />18. Section 7 consultation <br />19. Phase II Limited Site Investigation (LSI) <br />20. Development of a remediation work plan <br />21. Prepare Owner-Utility Reimbursement agreement <br />22. Right of way staking for utility relocations <br />23. Individual Section 404 Department of the Army Corps of Engineers <br />Permit <br />24. SWCD and MS4 review fees <br />25. IDEM Construction Stormwater General Permit and inspections <br />26. Completion of the IDEM Construction Stormwater General Permit Notice <br />of Termination <br />27. Buying Review <br />28. Relocation and/or Relocation Review