My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - Marion Street Pedestrian Bridge Proj No 123-060 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to PSA - Marion Street Pedestrian Bridge Proj No 123-060 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:21 PM
Creation date
6/10/2025 12:01:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or <br />omissions of any Contractor, Subcontractor or Supplier, or other individuals or <br />entities performing or furnishing any of the Work, for safety or security at the Site, <br />or for safety precautions and programs incident to Contractor's Work, during the <br />Construction Phase or otherwise. Engineer shall not be responsible for the failure <br />of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />A1.10 Post-Construction Phase <br />A. Upon written authorization from Owner during the Post-Construction Phase Engineer shall: <br />1. Together with Owner, visit the Project to observe any apparent defects in the Work, <br />assist Owner in consultations and discussions with Contractor concerning correction <br />of any such defects, and make recommendations as to replacement or correction of <br />defective Work, if any. <br />2. Together with Owner or Owner’s representative, visit the Project within one month <br />before the end of the correction period to ascertain whether any portion of the Work <br />is subject to correction. <br />3. Perform or provide the following additional Post-Construction Phase tasks or <br />deliverables: [Here list any such tasks or deliverables] <br />B. The Post-Construction Phase services may commence during the Construction Phase and, if <br />not otherwise modified in this Exhibit K, will terminate twelve months after the <br />commencement of the Construction Contract’s correction period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.