My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - Marion Street Pedestrian Bridge Proj No 123-060 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to PSA - Marion Street Pedestrian Bridge Proj No 123-060 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:21 PM
Creation date
6/10/2025 12:01:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOARD OF PUBLIC WORKS <br />AGENDA ITEM REVIEW REQUEST FORM <br />TO: Board of Public Works <br />FROM: Leslie Biek, P.E., Assistant City Engineer <br />SUBJECT: Preliminary Marion Street Pedestrian Bridge PSA/Consultant Contract <br />123-060 <br />DATE: 6/10/2025 <br />Attached is Amendment #1 to the PSA/Consulting Agreement for the Marion Street Pedestrian <br />Bridge project with Lochmueller Group Inc. <br />The scope of the project is to design a new pedestrian bridge that will carry a Multi-Use Path across <br />the St. Joseph River at Marion Street to the East Bank Trail. The proposed bridge will be a stand- <br />alone two-span pre-engineered, prefabricated steel truss structure with a reinforced concrete deck <br />on reinforced concrete substructure units on a deep foundation consisting of driven piles. <br />This contract is for design services needed to bid the project. Originally the contract was to perform <br />preliminary engineering and provide an alternative analysis report to determine the alignment of <br />the bridge. <br />The schedule of the project is to bid late fall of 2025 with construction in 2026. <br />It is requested the Board of Public Works approve Amendment #1 of the PSA/Consulting <br />Agreement with Lochmueller Group Inc. for the Marion Street Pedestrian Bridge. <br />Thank you for your consideration of this request.
The URL can be used to link to this page
Your browser does not support the video tag.