My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Access to Separate Storm Sewer Agreement DP24-030 - Momentum Development Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Access to Separate Storm Sewer Agreement DP24-030 - Momentum Development Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:08 PM
Creation date
6/10/2025 12:01:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Stormwater Pollution Prevention <br />Maintenance Guidelines for Post-Construction BMPs <br />Post-Construction Agreement <br />Property Address or Parcel Number: <br />510 S. Main Street, South Bend, Indiana; 018-3017-0618 <br />Post-Construction BMP Maintenance Activity Schedule <br />Storm Inlets and <br />Structures <br />Inspect storm inlets and structures and remove built-up <br />vegetation, trash, and debris. <br />Monthly; as <br />needed. <br />Storm Inlets, Structures, <br />and Pipes <br />Inspect pipes located within the structures for signs of <br />clogging or damage, repair as needed. <br />Annually; as <br />needed. <br />OWNER’S ACKNOWLEDGEMENT: <br />The owner of the above property agrees to implement maintenance of the above listed post-construction <br />stormwater best management practices. The owner understands that this is a requirement by the municipality, <br />the federal Clean Water Act, and the Indiana Department of Environmental Management. As part of the <br />agreement, the owner understands that they must allow access to the property by the stormwater inspector. <br />Upon occupancy and/or post-construction inspections, the owner agrees to accept responsibility for the <br />maintenance of any practices found to be in violation by the inspector.
The URL can be used to link to this page
Your browser does not support the video tag.