Laserfiche WebLink
INTER-OFFICE MEMORANDUM <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Patrick Sherman: Director of Project Management <br />SUBJECT: Raclin Murphy Encore Center: Change Order #3 <br />DATE: June 10th, 2025 <br />Greetings, <br />The documents herein detail the costs associated with Change Order #3 for the Raclin Murphy <br />Encore Center project. This includes a variety of costs associated with the project including <br />items required by the building and fire departments, necessary design adjustments, and owner <br />items, the largest of which is the addition of the Equity in the Arts Programming space. <br />CCD 2 Utility Routing $0.00 <br />CCD 3 High GFRC Cornice to Coping $0.00 <br />CCD 1 ASI 1 FDC and Storz Connection $26,203.00 <br />Site Camera $4,510.00 <br />Fire Alarm Panel Change $1,000.00 <br />2-Tone Curtain Wall/Storefront $9,277.00 <br />Acoustic Panel Insulation Thickness (Deduct - RFI) -$6,640.00 <br />Modification to Large Light Fixtures $0.00 <br />CCD 10R1 Flooring and Paint Finishes $1,762.00 <br />CCD 7 Ceiling Layout $0.00 <br />CCD 9 Sump Pump $18,968.00 <br />CCD 12 Site Electrical $24,591.00 <br />CCD 4 Equity in the Arts $249,156.00 <br />ASI 11 Natural Gas Piping Routing $2,339.00 <br />Total $331,166.00 <br />Thank you and please let me know if you have any questions. <br />Patrick Sherman