Laserfiche WebLink
BID TAB - Bids Opened: May 27, 2025 <br />City of South Bend <br />2025 Community Crossings Matching Grant <br />ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT <br />A-1 MOBILIZATION, DEMOBILIZATION LS 1 $32,672.06 $32,672.06 $40,560.00 $40,560.00 $26,000.84 $26,000.84 <br />A-2 CONSTRUCTION ENGINEERING LS 1 $19,603.24 $19,603.24 $1,887.87 $1,887.87 $3,000.00 $3,000.00 <br />A-3 MAINTENANCE OF TRAFFIC LS 1 $13,068.82 $13,068.82 $25,000.00 $25,000.00 $14,000.00 $14,000.00 <br />A-4 EROSION CONTROL LS 1 $19,603.24 $19,603.24 $800.00 $800.00 $5,926.00 $5,926.00 <br />A-5 MILLING, ASPHALT, 1.5 IN.SYS 5623 $2.50 $14,057.50 $3.80 $21,367.40 $3.30 $18,555.90 <br />A-6 MILLING, ASPHALT, 4 IN.SYS 14238 $4.00 $56,952.00 $4.00 $56,952.00 $3.75 $53,392.50 <br />A-7 HMA, SURFACE, PG 58H-28, 9.5mm, TYPE C TON 1638.5 $125.00 $204,812.50 $99.00 $162,211.50 $103.55 $169,666.68 <br />A-8 HMA, INTERMEDIATE, PG 58S-28, 19.0 mm, TYPE B TON 1957.7 $98.00 $191,854.60 $79.00 $154,658.30 $74.80 $146,435.96 <br />A-9 TACK COAT TON 7 $500.00 $3,500.00 $1,500.00 $10,500.00 $1,123.15 $7,862.05 <br />A-10 LINE, MULTI-COMPONENT, SOLID, YELLOW, 6 IN.LFT 6874 $1.00 $6,874.00 $2.00 $13,748.00 $2.00 $13,748.00 <br />A-11 LINE, MULTI-COMPONENT, SOLID, WHITE, 6 IN.LFT 6417 $1.00 $6,417.00 $2.00 $12,834.00 $2.00 $12,834.00 <br />A-12 LINE, MULTI-COMPONENT, BROKEN, YELLOW, 6 IN.LFT 6163 $1.60 $9,860.80 $0.01 $61.63 $0.01 $61.63 <br />A-13 LINE, MULTI-COMPONENT, BROKEN, WHITE, 6 IN.LFT 120 $1.10 $132.00 $2.00 $240.00 $2.00 $240.00 <br />A-14 TRANSVERSE MARKING, MULTI-COMPONENT STOP LINE, 24 IN LFT 66 $12.50 $825.00 $40.00 $2,640.00 $40.00 $2,640.00 <br />A-15 TRANSVERSE MARKING, CROSSWALK LINE, 12 IN LFT 354 $5.00 $1,770.00 $20.00 $7,080.00 $20.00 $7,080.00 <br />A-16 PAVEMENT MESSAGE MARKING LANE INDICATION ARROW EA 3 $205.00 $615.00 $500.00 $1,500.00 $500.00 $1,500.00 <br />A-17 PAVEMENT MESSAGE MARKING THERMO WORD "ONLY"EA 2 $225.00 $450.00 $600.00 $1,200.00 $600.00 $1,200.00 <br />A-18 GROOVING FOR PAVEMENT MARKINGS LFT 20441 $0.80 $16,352.80 $0.25 $5,110.25 $0.25 $5,110.25 <br />A-19 DETECTOR HOUSING, REPLACE EA 3 $2,000.00 $6,000.00 $1,500.00 $4,500.00 $2,300.00 $6,900.00 <br />A-20 TRAFFIC LOOP EA 12 $800.00 $9,600.00 $800.00 $9,600.00 $980.00 $11,760.00 <br />A-21 SODDING, NURSERY SYS 5369 $12.00 $64,428.00 $8.85 $47,515.65 $8.85 $47,515.65 <br />A-22 SHOULDER, COMPACTED AGGREGATE No. 53 CYS 58.3 $87.13 $5,079.68 $150.00 $8,745.00 $131.95 $7,692.69 <br />A-23 MILLING, 8 IN SYS 5894 $10.00 $58,940.00 $8.00 $47,152.00 $8.90 $52,456.60 <br />A-24 TOPSOIL, 4 IN CYS 597 85.00$ $50,745.00 $43.60 $26,029.20 $77.45 $46,237.65 <br />A-25 B BORROW, 4 IN CYS 656 52.00$ $34,112.00 $33.70 $22,107.20 $78.35 $51,397.60 <br />B-1 MOBILIZATION, DEMOBILIZATION LS 1 $89,666.51 $89,666.51 $76,000.00 $76,000.00 $150,000.24 $150,000.24 <br />B-2 CONSTRUCTION ENGINEERING LS 1 $53,799.91 $53,799.91 $18,927.52 $18,927.52 $37,000.00 $37,000.00 <br />B-3 MAINTENANCE OF TRAFFIC LS 1 $35,866.60 $35,866.60 $30,800.00 $30,800.00 $37,000.00 $37,000.00 <br />B-4 EROSION CONTROL LS 1 $53,799.91 $53,799.91 $10,500.00 $10,500.00 $35,000.00 $35,000.00 <br />B-5 COMMON EXCAVATION CYS 7500 $30.00 $225,000.00 $26.00 $195,000.00 $30.65 $229,875.00 <br />B-6 HMA, SURFACE, PG 58H-28, 9.5mm, TYPE C TON 730 $125.00 $91,250.00 $116.00 $84,680.00 $110.10 $80,373.00 <br />B-7 HMA, INTERMEDIATE, PG 58S-28, 19.0 mm, TYPE B TON 1178 $100.00 $117,800.00 $96.00 $113,088.00 $83.55 $98,421.90 <br />B-8 HMA, BASE, PG 58S-28, 25.0 mm, TYPE B TON 3770 $95.00 $358,150.00 $90.00 $339,300.00 $82.45 $310,836.50 <br />B-9 TACK COAT TON 3.5 $500.00 $1,750.00 $2,500.00 $8,750.00 $1,688.15 $5,908.53 <br />B-10 JOINT ADHESIVE, SURFACE LFT 3050 $0.75 $2,287.50 $0.10 $305.00 $1.55 $4,727.50 <br />B-11 JOINT ADHESIVE, INTERMEDIATE LFT 3050 $0.75 $2,287.50 $0.10 $305.00 $1.55 $4,727.50 <br />B-12 MILLING, ASPHALT, 1.5 IN SYS 224 $270.00 $60,480.00 $1.00 $224.00 $32.15 $7,201.60 <br />B-13 TRANSITION MILLING SYS 647 $10.00 $6,470.00 $1.00 $647.00 $8.60 $5,564.20 <br />B-14 COMPACTED AGGREGATE, NO. 53 CYS 7512 $48.00 $360,576.00 $3.00 $22,536.00 $37.00 $277,944.00 <br />B-15 SUBGRADE TREATMENT, TYPE I SYS 9600 $28.00 $268,800.00 $1.00 $9,600.00 $6.45 $61,920.00 <br />B-16 MANHOLE, ADJUST TO GRADE EA 6 $1,000.00 $6,000.00 $900.00 $5,400.00 $495.75 $2,974.50 <br />B-17 INLET, ADJUST TO GRADE EA 2 $1,000.00 $2,000.00 $600.00 $1,200.00 $468.05 $936.10 <br />B-18 WATER VALVE, ADJUST TO GRADE EA 4 $750.00 $3,000.00 $600.00 $2,400.00 $227.50 $910.00 <br />B-19 LINE, MULTI-COMPONENT, SOLID, YELLOW, 6 IN.LFT 1961 $1.00 $1,961.00 $2.50 $4,902.50 $2.50 $4,902.50 <br />B-20 LINE, MULTI-COMPONENT, SOLID, WHITE, 6 IN.LFT 4025 $1.00 $4,025.00 $2.50 $10,062.50 $4.04 $16,261.00 <br />B-21 TRANSVERSE MARKING, CROSSWALK LINE, 24 IN LFT 176 $13.00 $2,288.00 $25.00 $4,400.00 $25.00 $4,400.00 <br />B-22 GROOVING FOR PAVEMENT MARKINGS LFT 6162 $1.00 $6,162.00 $2.00 $12,324.00 $2.00 $12,324.00 <br />B-23 CONCRETE CENTER ISLAND SYS 59 $130.00 $7,670.00 $420.00 $24,780.00 $190.70 $11,251.30 <br />B-24 CURB, CONCRETE LFT 1891 $130.00 $245,830.00 $46.00 $86,986.00 $25.65 $48,504.15 <br />B-25 SODDING, NURSERY SYS 821.1 $12.00 $9,853.20 $12.25 $10,058.48 $12.25 $10,058.48 <br />B-26 NOT USED -- <br />B-27 TOPSOIL CYS 114 $85.00 $9,690.00 $116.00 $13,224.00 $85.00 $9,690.00 <br />B-28 CURB RAMP, CONCRETE LS 1 $6,500.00 $6,500.00 $5,600.00 $5,600.00 $3,814.00 $3,814.00 <br />AA-1 MOBILIZATION, DEMOBILIZATION LS 1 7,965.16$ 7,965.16$ $15,321.50 $15,321.50 $7,658.58 $7,658.58 <br />AA-2 CONSTRUCTION ENGINEERING LS 1 4,779.09$ 4,779.09$ $1,700.00 $1,700.00 $4,700.00 $4,700.00 <br />AA-3 MAINTENANCE OF TRAFFIC LS 1 3,186.06$ 3,186.06$ $7,000.00 $7,000.00 $4,634.00 $4,634.00 <br />AA-4 EROSION CONTROL LS 1 4,779.09$ 4,779.09$ $600.00 $600.00 $1,836.15 $1,836.15 <br />AA-5 COMMON EXCAVATION CYS 539 35.00$ 18,865.00$ $38.00 $20,482.00 $37.20 $20,050.80 <br />AA-6 PCCP FOR APPROACHES, 7 IN SYS 78.4 93.65$ 7,342.16$ $162.00 $12,700.80 $83.95 $6,581.68 <br />AA-7 HMA, SURFACE, PG 58S-28, 9.5mm, Type B TON 68 115.00$ 7,820.00$ $143.00 $9,724.00 $136.25 $9,265.00 <br />AA-8 HMA, INTERMEDIATE, PG 58S-28, 19.0 mm, TYPE B TON 106 100.00$ 10,600.00$ $106.00 $11,236.00 $101.50 $10,759.00 <br />AA-9 HMA BASE, PG 58S-28, 25.0 mm, TYPE B TON 169 95.00$ 16,055.00$ $91.00 $15,379.00 $99.40 $16,798.60 <br />AA-10 STORMWATER LS 1 6,000.00$ 6,000.00$ $14,500.00 $14,500.00 $11,578.00 $11,578.00 <br />AA-11 MILLING, ASPHALT, 1.5 IN SYS 16 3.00$ 48.00$ $200.00 $3,200.00 $112.10 $1,793.60 <br />AA-12 CURB, CONCRETE, 6 IN LFT 595 60.00$ 35,700.00$ $40.00 $23,800.00 $30.40 $18,088.00 <br />AA-13 SIDEWALK, CONCRETE, 4 IN SYS 13.4 90.00$ 1,206.00$ $167.00 $2,237.80 $186.00 $2,492.40 <br />AA-14 TRANSVERSE MARKING, CROSSWALK LINE, 24 IN LFT 56 13.00$ 728.00$ $25.00 $1,400.00 $31.25 $1,750.00 <br />AA-15 SODDING, NURSERY SYS 319.5 12.00$ 3,834.00$ $44.00 $14,058.00 $30.70 $9,808.65 <br />AA-16 ADJUST CASTING TO GRADE EA 1 1,000.00$ 1,000.00$ $1,200.00 $1,200.00 $467.65 $467.65 <br />AA-17 ADJUST VALVE TO GRADE EA 1 750.00$ 750.00$ $600.00 $600.00 $275.40 $275.40 <br />AA-18 TACK COAT TON 0.2 500.00$ 100.00$ $3,600.00 $720.00 $935.95 $187.19 <br />AA-19 SUBGRADE TREATMENT, TYPE II SYS 765 30.00$ 22,950.00$ $19.00 $14,535.00 $14.05 $10,748.25 <br />AA-20 CURB RAMP, CONCRETE SYS 21 210.00$ 4,410.00$ $180.00 $3,780.00 $174.90 $3,672.90 <br />AA-21 DETECTABLE WARNING SURFACE SYS 3.9 325.00$ 1,267.50$ $220.00 $858.00 $204.50 $797.55 <br />AA-22 CONCRETE WALK, REMOVE SYS 39.7 25.00$ 992.50$ $17.00 $674.90 $44.00 $1,746.80 <br />AA-23 CONCRETE, REMOVE SYS 68 10.00$ 680.00$ $25.00 $1,700.00 $40.90 $2,781.20 <br />AA-24 NOT USED --- <br />AA-25 CONCRETE CURB, 6 IN, REMOVE LFT 46 15.00$ 690.00$ $15.00 $690.00 $38.00 $1,748.00 <br />AA-26 WOODEN STEPS, REMOVE LFT 15 15.00$ 225.00$ $46.00 $690.00 $40.30 $604.50 <br />AA-27 WOODEN FENCE, REMOVE LFT 34 15.00$ 510.00$ $40.00 $1,360.00 $17.50 $595.00 <br />AA-28 DECIDUOUS TREE, REMOVE EA 16 1,000.00$ 16,000.00$ $875.00 $14,000.00 $875.00 $14,000.00 <br />AA-29 NOT USED --- <br />AA-30 COMPACTED AGGREGATE No. 53 CYS 17 90.00$ 1,530.00$ $109.00 $1,853.00 $218.30 $3,711.10 <br />AB-1 MOBILIZATION, DEMOBILIZATION LS 1 6,228.21$ 6,228.21$ $20,703.80 $20,703.80 $7,658.53 $7,658.53 <br />Engineer's Estimate Milestone Contractors Rieth-Riley Construction Co. Inc <br />LINE "A" - OLD US 31 (MICHIGAN ST) FROM KERN ROAD TO COUNTY LIMITS <br />SUBTOTAL "A"$828,325.24 $684,000.00 $713,213.99 <br />LINE "B" - RIVERSIDE DRIVE FROM CLEVELAND RD TO BOLAND DR <br />SUBTOTAL "B"$2,032,963.13 $1,092,000.00 $1,472,525.99 <br />LINE "AA" - HIGHLAND STREET <br />SUBTOTAL "AA"$180,012.57 $196,000.00 $169,130.00 <br />LINE "AB" - HILLSIDE AVE