Laserfiche WebLink
<br />South Bend <br />Redevelopment Commission <br />227 West Jefferson Boulevard, Room 1308, South Bend, Indiana <br /> <br /> <br /> <br />Redevelopment Commission Agenda Item <br /> <br />DATE: 06/12/2025 <br /> <br />FROM: Caitlin Wyant, EI; Gemma Stanton, EI <br /> Public Works – Engineering <br /> <br />SUBJECT: Dylan Drive LighƟng Improvements <br /> <br /> <br />Funding Source* (circle) River West; River East; South Side; Douglas Road; West Washington; RDC General; Riv. East Res. <br />* Funds are subject to the City Controller's determinaƟon of availability; if funds are unavailable, as solely determined by the City Controller, then the <br />authorizaƟon of the expenditure of such funds shall be void and of no effect. <br /> <br />PURPOSE OF REQUEST: <br /> <br />RequesƟng addiƟonal funding for lighƟng improvements on Dylan Drive (between Brick Road and Adams Road), <br />Carbonmill Drive, Parkland Drive, and Chet Waggoner Drive <br /> <br /> <br />SPECIFICS: <br /> <br />The esƟmated cost of this project from the consultant (JPR) is $478,660 with a 10% conƟngency. Combining 2024 <br />and 2025 Light Up South Bend funds, and funds already allocated for this project as listed in DFO, an addiƟonal <br />$140,500 is needed to bid this project. <br /> <br /> <br /> <br /> <br /> <br />_________________________Pres/V-Pres <br /> <br />ATTEST: __________________Secretary <br /> <br />Date: ____________________ <br /> <br /> APPROVED Not Approved <br />SOUTH BEND REDEVELOPMENT COMMISSION