Laserfiche WebLink
$45.001.00 to 46,000.00$214.00 <br /> $46,001.00 to 47,000.00$217.00 <br /> $47,001.00 to 48,000.00$220.00 <br /> $48,001.00 to 49,000.00$223.00 <br /> $49,001.00 to 50,000.00$226.00 <br /> $50,001.00 to 51,000.00$229.00 <br /> $51,001.00 to 52,000.00$232.00 <br /> $52,001.00 to 53,000.00$235.00 <br /> $53,001.00 to 54,000.00$238.00 <br /> $54,001.00 to 55,000.00$241.00 <br /> $55,001.00 to 56.000.00$244.00 <br /> $56,001.00 to 57,000.00$247.00 <br /> $57,001.00 to 58,000.00$250.00 <br /> e. Remodeling over$58,000$253.00 <br /> * All of the above include a$15.00 Processing Fee. <br /> (4) Northeast Neighborhood Development Area Overlay Zoning District a/k/a Northeast <br /> Neighborhood Development Area Design Review Fees: <br /> Required for all standalone residential or commercial new construction, in addition to <br /> and separate from any other permit, processing, or review fee: $160.00 <br /> The Department's review or processing of all of the above listed matters is subject to <br /> form and submission requirements which are available for inspection in the office of <br /> the Building Department, and viewable on the City website, www.southbendin.gov. <br /> (5) Engineering Review Fees: <br /> a. Downspout/Drainage Disconnection Check: Field check to determine whether <br /> building or site discharges stormwater through pipe conveyance into City sewer <br /> system. <br /> (1) Previously Confirmed Disconnect: exempt <br /> (2) Single-Use Residential: $20.00* <br /> (3) Other: $50.00* <br /> *Downspout/Drain Disconnection Fee shall be waived until January 1, 2018. <br /> b. Drainage Review (Required of all non-single-use residential) $150.00 <br /> c. Utility Verification Fee $50.00 <br /> (Ord. No. 9779-07, § III, 8-27-07; Ord. No. 9902-09, § I, 2-9-09; Ord. No. 10137-11, § II, 12-12- <br /> 11; Ord. No. 10177-12, § I, 8-13-12; Ord. No. 10394-15, § II, 10-26-15; Ord. No. 10403-15, <br /> § I, 11-23-15; Ord. No. 10575-18 , § II, 1-22-18) <br /> At least two(2)copies of the Building Code, together with amendments and <br /> supplements thereto, shall be kept in the Department office for public inspection. <br /> (Ord. No. 8243-92, § 1; Ord.No. 9779-07, § II, 8-27-07) <br /> Sec. 6-4.3. Enforcement by Building Department. <br /> (a) The Building Department, with the assistance of the South Bend Fire Department as necessary or <br /> required, is the City agency to administer and enforce the rules,regulations,and code adopted and <br /> promulgated under this chapter. <br /> (b) No building permit will be issued to a person that would cause a violation of IC 22-15-3-7. <br /> (c) This building code does not apply to an industrialized building system or mobile structure that is <br /> certified under IC 22-15-4. <br /> Page 9 of 42 <br />