My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Main Line Service Agreement DP24-020 - Sherman Partners SB LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Water Main Line Service Agreement DP24-020 - Sherman Partners SB LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:45:39 PM
Creation date
5/27/2025 2:44:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Within ten (10) days of City’s acceptance of the Dedicated Improvements, Owner shall <br />provide the City with a maintenance bond equal to ten percent (10%) of the construction cost <br />covering all work performed or to be performed pursuant to this Agreement, and such bond shall <br />remain in effect for three (3) years after dedication as described in Section 10 below. <br />8.Term <br />Except as otherwise provided herein, this Agreement shall continue for a period of sixteen <br />(16) months from the Effective Date of this Agreement, or upon the issuance of the relevant <br />occupancy permit(s), whichever occurs last. <br />9.Dedication <br />Upon completion of the construction of the Dedicated Improvements substantially as <br />depicted in Exhibit A, the Owner shall also convey an easement and dedicate to the City within <br />such easement the Dedicated Improvements as public infrastructure. It is understood by the Owner <br />that no dedication shall be accepted by the City until all required easements have been conveyed, <br />accepted, and recorded by the City. The Owner shall use its best efforts to work with the City to <br />ensure that the Dedicated Improvements are dedicated to the City in a timely manner. <br />Additionally, prior to dedication, the following must be satisfied: <br />a.All parts and labor must meet the standards and requirements stated in the design <br />specifications as presented to and accepted by the City's Engineering Department. <br />b.Lien waivers must be received with regard to all workmanship and materials used in <br />connection with these improvements. <br />c.The Final Dedication must be furnished to Owner by the South Bend, Indiana Board of <br />Public Works. <br />d. Owner must provide copies of test reports or cut sheets on all materials supplied. <br />e.Owner must provide all tests required by City of South Bend Construction Standards and
The URL can be used to link to this page
Your browser does not support the video tag.