My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Main Line Service Agreement DP24-020 - Sherman Partners SB LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Water Main Line Service Agreement DP24-020 - Sherman Partners SB LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:45:39 PM
Creation date
5/27/2025 2:44:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The parties hereto acknowledge and agree that the foregoing recitals are incorporated <br />herein as a part of this Agreement. <br />2.Design <br />The Owner shall consult the City and allow the City Engineer or her designee input prior <br />to designating a project engineer who shall be responsible for the engineering design and <br />inspection in connection with the installation of the Dedicated Improvements (the "Project <br />Engineer"). The Owner shall inspect the site during construction to ensure the Project Engineer’s <br />conformance to zoning requirements, adequacy of design, and conformance to the City's <br />specifications and standards regarding location, size and depth of line, and quality of construction <br />of the Dedicated Improvements. The Owner shall provide the plans with a City of South Bend <br />cover sheet and specifications for the Dedicated Improvements along with a cost estimate to the <br />City. The Owner shall also provide to the City a statement from the Project Engineer certifying <br />that the materials and workmanship including pipes, bedding, manholes, and other related <br />materials and work meet the City’s specifications and standards. Upon request of the City, the <br />certification shall be substantiated by material affidavits from suppliers and by applicable test <br />results for inflow/infiltration, exfiltration, deflection, pressure, leaks, bacteria, compaction and <br />other tests required by the City. All construction, engineering, and inspection costs in connection <br />with the Dedicated Improvements shall be borne by the Owner. <br />3.Construction Inspection <br />The Owner has provided the City with Exhibit A, which depicts drawings of the Dedicated <br />Improvements, which the City acknowledges conforms to the City’s standards. The Owner shall <br />allow the City to inspect the Dedicated Improvements during construction to ensure conformance to <br />the agreed standards set forth in Exhibit A, in particular with regard to zoning requirements, <br />adequacy of design, and quality of construction. The Owner shall contact the City’s Engineering
The URL can be used to link to this page
Your browser does not support the video tag.