Laserfiche WebLink
QUOTE TABULATION <br />125-011 2025 Tree Planting <br />BASE QUOTE TOTAL <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost <br />1 Mobilization / Demobilization 1 LS $5,000.00 $5,000.00 <br />$11,082.00 $11,082.00 <br />2 Excavation / Grading / Tilling 1 LS $2,000.00 $2,000.00 <br />$71,744.00 $71,744.00 <br />3 Demolition (Utility Cut Pavement Removal)1 LS $6,000.00 $6,000.00 <br />$2,500.00 $2,500.00 <br />4 Concrete Sidewalk, 4”93 SYS $90.00 $8,370.00 <br />$58.00 $5,394.00 <br />5 Asphalt Patch (Utility Cut for Water Line)1 LS $8,500.00 $8,500.00 <br />$7,230.00 $7,230.00 <br />6 #53 Compacted Aggregate (Under Pavilion and 210 TON $175.00 $36,750.00 <br />$65.00 $13,650.00 <br />7 3” Domestic Water Line, DIP (Irrigation Control 32 LF $175.00 $5,600.00 <br />$372.00 $11,904.00 <br />8 Water Meter Pit 1 EA $10,000.00 $10,000.00 <br />$9,870.00 $9,870.00 <br />8 Pavilion, Monoslope 20x30 1 EA $50,000.00 $50,000.00 <br />$67,500.00 $67,500.00 <br />10 Tree Placement 1 LS $5,200.00 $5,200.00 <br />$76,141.00 $76,141.00 <br />$137,420.00 $277,015.00BASE QUOTE TOTAL <br />Acorn LandscapingEngineer's Estimate <br />S:\Public Works\Projects\Projects by Year\2025 Projects\125-017 Urban Tree Nurseries\1 - Admin\1 - BPW Documents\125-017 Quote Tabulation.xlsx