My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - SJCA Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - SJCA Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:38:29 PM
Creation date
5/27/2025 2:38:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10PROJECT MANAGER PROJECT TEAM PROJECT APPROACH PROJECT EXPERIENCE <br />PROJECT EXPERIENCE <br />SJCA INC | CITY OF SOUTH BEND RFP | CONSTRUCTION INSPECTION | KENNEDY ACADEMY <br />I-65/I-70 NORTH SPLIT RECONSTRUCTION <br />SJCA had inspectors on the I-65/I-70 North Split <br />project in Indianapolis beginning in December 2020. <br />Our inspectors and engineers were able to add to their <br />skills and knowledge base on this large-scale project. <br />They performed inspections for many different types of <br />construction disciplines. Long hours and the necessity <br />to move quickly from one construction discipline to <br />another were challenges that the inspection team met <br />with confidence. <br />MARQUETTE MULTI-USE TRAIL <br />SJCA was the prime consultant for the construction <br />inspection for the Marquette Multi-Use Trail located <br />in LaPorte County, Indiana in the town of Michiana <br />Shores. This project posed significant challenges due <br />to the extensive tree removal required, all of which had <br />to be completed within a highly compressed timeline, <br />requiring our inspection staff to be able to disseminate <br />between multiple removal items. There were four trees <br />that the contractor did not necessarily agree with. <br />However, due to a strong desire to protect our client's <br />best interest, we were able to work with the design team <br />and determine that these items were indeed correct in <br />the contract documents. Therefore, our client was not <br />required to stand for an extremely large change order. <br />I-69 FINISH LINE <br />SJCA provided construction inspection personnel <br />for the I-69 Finish Line project, which completed the <br />final connection between Indianapolis and Evansville, <br />Indiana via Interstate. This significant infrastructure <br />project allowed our construction staff to enhance their <br />skills across multiple aspects of construction inspection. <br />The fast-paced nature of the project required our <br />team to perform a wide variety of inspection tasks <br />daily, while simultaneously maintaining meticulous <br />records and upholding strong public relations. This <br />experience further strengthened our team’s capability <br />to deliver high-quality inspection services under <br />challenging conditions.
The URL can be used to link to this page
Your browser does not support the video tag.