My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - Abonmarche Consultants
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - Abonmarche Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:37:58 PM
Creation date
5/27/2025 2:37:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> ENGINEERING • ARCHITECTURE • LAND SURVEYING <br />• The Olive and Sample Street <br />Overpasses <br />• IR-30143 – the US 31 connection on <br />the south side of South Bend <br />• The Two-Way Downtown Street <br />Conversion Project <br />The Riverside Trail Project along the river <br />northwest of downtown <br />His comprehensive knowledge of INDOT <br />processes and public works construction <br />will be essential in ensuring rigorous <br />oversight, effective communication, and <br />successful delivery of the inspection phase of this project. <br />PROJECT INITIATION AND PRE-CONSTRUCTION <br />Before scheduling a formal kick-off meeting with the City of South Bend, our Project <br />Manager and INDOT-certified construction inspection staff will conduct a thorough review <br />of all contract documents, including plans and specifications. This review will be <br />accompanied by a detailed site visit to evaluate existing conditions and identify any <br />potential challenges or critical construction details. <br />Following our internal review, we will coordinate an inspection -specific kick-off meeting with <br />the City. This preliminary meeting provides an opportunity to discuss construction <br />expectations, logistics, and any emerging concerns. These items will be addressed and <br />resolved ahead of the formal pre-construction meeting, which will then be scheduled with <br />all required stakeholders. We anticipate holding the pre-construction meeting within two <br />weeks of the Notice to Proceed for the construction contract. <br />CONSTRUCTION PHASE <br />Once construction begins, Abonmarche—alongside our partner McCormick Engineering— <br />will provide full-time on-site inspection through a Resident Project Representative (RPR). <br />Based on the intensity and complexity of ongoing operations, we may supplement the <br />team with additional full-time inspectors as needed. <br />The RPR will serve as the primary point of contact in the field, ensuring contract compliance, <br />addressing questions or issues in real-time, and maintaining open communication with the <br />contractor and project stakeholders. Oversight and QA/QC responsibilities will be led by the <br />Construction Manager, who will ensure continuous inspection coverage and full <br />documentation of all construction activities in accordance with INDOT and FHWA <br />standards. <br />PROJECT INITIATION <br />8
The URL can be used to link to this page
Your browser does not support the video tag.