Laserfiche WebLink
Location Description <br />City of <br />Angola <br />1,100 LF of sidewalk replacement in <br />addition to 1,500 LF of new sidewalk <br />Town of <br />Waterloo <br />5,000 LF of sidewalk including all <br />ADA curb ramps and pavement <br />markings <br />City of <br />Auburn, IN <br />5,650 LF of pedestrian facilities <br />surrounding McKenney-Har rison and <br />James R. Watson Elementar y <br />Schools. <br />City of <br /> Gar rett <br />2,500 LF of sidewalk replacement <br />and 85 ADA compliant curb ramps <br />Town of <br /> St. Joe <br />12,000 LF of sidewalk throughout <br />town with 60 ADA cub ramps and 12 <br />crossings. <br />City of New <br />Haven <br />5,800 LF of sidewalk along with ADA <br />compliant ramps and drainage <br />improvements <br />St. Joe SRTS Project <br />A&Z Photo of construction progress on <br />Ameritech Dr. and Cleveland Rd. Intersection. <br />C C M G : W e s t g a t e N e i g h b o r h o o d <br />Client: City of Columbia City <br />Reference: Ryan Daniel, Mayor <br />This is a multi-phase CCMG project that included the <br />design and inspection of the roadway improvements <br />throughout an entire neighborhood. A large portion <br />of these improvements included sidewalk <br />replacement and new sidewalk construction along <br />with ADA compliant ramps. <br />C C M G : A v i l l a , I n d i a n a <br />Reference: Adam Dunlap, Town Manager <br />Since 2017, the Town has selected A&Z as their <br />partner for the construction oversight of over 5 <br />CCMG projects. In addition to the roadway and <br />underground infrastructure improvements, the scope <br />of these projects has also included upgrading <br />pedestrian facilities and ensuring ADA compliance. <br />D E M O N S T R A T E D Q U A L I F I C A T I O N S <br />S I M I L A R P R O J E C T E X P E R I E N C E <br />Projects featured below include the design and/or <br />construction inspection of the pedestrian facilities. <br />S A F E R O U T E S T O S C H O O L <br />A &Z C O M P L E T E D P R O J E C T S <br />Page 6 <br />A&Z has assisted the City of South Bend on <br />numerous improvements as the lead design firm. <br />Just like our design staff, the City can trust the <br />integrity and expertise of our inspection staff. Some <br />of our notable work with the City includes: <br />Ongoing CCMG Projects from 2022-Present <br />Mishawaka Avenue Streetscape <br />Ameritech Dr. & Cleveland Rd. Intersection <br />Miami St. and Lincolnway East Intersection <br />Ironwood Dr. and Ireland Rd. Intersection <br />C C M G : L o g a n s p o r t , I N <br />Reference: Chris Martin, Mayor <br />A&Z’s most recent collaboration with the City of <br />Logansport was the inspection of the installation of <br />concrete curb and gutter, ADA curb ramps, sidewalk, <br />and roadway milling/resurfacing. <br />F A M I L I A R I T Y W I T H T H E <br />C I T Y O F S O U T H B E N D <br />One of the recently completed streets in Avilla, IN <br />Westgate Neighborhood is currently in its 3 phase .rd