My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - SRTS Kennedy School Proj No 123-017 - A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:37:51 PM
Creation date
5/27/2025 2:37:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scoring Categor y A&Z’s Advantage <br />Past Perfor mance <br />Our team is known for its responsiveness, clear documentation, and ability to keep projects moving smoothly. <br />Strong history of high INDOT performance ratings in inspection categories <br />Positive feedback from LPA clients across northern Indiana. <br />Recognized for maintaining open communication, thorough reporting, and dependable field presence <br />Trusted by local agencies for our ability to navigate challenges and support timely project delivery <br />Team’s <br />Demonstrated <br />Qualifications <br />A&Z’s inspection team has direct experience with sidewalk, curb ramp, and pedestrian-focused improvements in urban environments. <br />Additionally: <br />Proven success on Safe Routes to School- specific projects. <br />All proposed inspectors are INDOT AWP trained and experienced with LPA procedures <br />Daily field staff backed by an in-house QA/QC lead and inspection manager <br />Familiar with contractor expectations, City standards, and INDOT/FHWA compliance <br />Routinely praised for professionalism, accuracy, and proactive field coordination <br />In-house QA/QC backing all inspection work. <br />Capacity of Team <br />A&Z has the staff, structure, and flexibility to fully suppor t this project—without overextending resources or compromising quality. <br />Dedicated inspection staff assigned specifically to this project <br />Regional presence ensures quick response and consistent daily oversight <br />Backup personnel identified—equally qualified and ready to step in if needed <br />Team availability carefully managed to ensure full coverage from pre-con to closeout <br />Project Approach <br />A&Z understands the unique setting near Kennedy Academy and will continue to tailor our services to meet the project demands and the needs <br />of the City. <br />Daily on-site presence with the technology to generate real-time documentation. <br />Support for MOT and detour management—including contingencies for pedestrians and increased traffic during peak school times. <br />Close utility coordination to prevent relocation delays <br />Clear, responsive communication tailored to City preferences <br />Ability to support community outreach efforts if requested. <br />W H Y S E L E C T T H E A &Z T E A M ... <br />This project demands an experienced, flexible inspection team that understands the expectations of Local Public Agencies and the communities they serve. A&Z’s cer tified <br />inspectors and project managers have overseen similar rural roundabout and roadway projects and are well-versed in identifying and resolving issues before they impact <br />progress. We’re ready to suppor t the City with proactive oversight, strong communication, and a commitment to quality from star t to finish. <br />Page 10
The URL can be used to link to this page
Your browser does not support the video tag.