My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening and Award Quotation- Ivy Alley Windows Proj No 125-029R - D-8 Glass
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Quotations & Proposals
>
Opening and Award Quotation- Ivy Alley Windows Proj No 125-029R - D-8 Glass
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 2:21:33 PM
Creation date
5/27/2025 2:20:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page: 1 <br />Logikal 12.2 - ORGADATA AG , Am Nesseufer 14, 26789 Leer, Germany, +49 491 92782-500 <br />Please check all results for plausibility. We do not take responsibility for any errors. <br /> - - <br />Date: 5/13/2025 <br />Quotation <br />Project: 321 Main St - North facing <br />Elevation Quantity Description Total <br />[$] <br />001- 5 Pcs <br />Interior View <br />Frame Elevations 66" x 80", Consisting of a Fixed Bay. <br />System: Tubelite 14000 <br />Finishes: <br />Profiles: CLASS I DARK BRONZE <br />Glazing: <br />1 x 2x1/4" 1" Insulated Tempered <br />Wall Connection / Subframe: <br />T14259 <br />Installation: <br />Installation with Sealing to Structure <br />$ 12,269.62 <br />7.00 %$ 493.09 <br />Grand Total Net <br />Sales Tax <br />Total Price $ 12,762.71 <br />This quote does not included a break metalThis quote assumes there is a lift to use onsiteIf a lift is needed please add $1,950 to the quote
The URL can be used to link to this page
Your browser does not support the video tag.