BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />d j
<br />Project Name: 2025 Community Crossings Matching Grant
<br />Project 125-004
<br />Number:
<br />For Bids Due: May 27, 2025
<br />Contractor
<br />Name: Rieth-Riley Construction Co., Inc.
<br />AA-20
<br />CURB RAMP, CONCRETE
<br />SYS
<br />21
<br />$174.90
<br />1$3,672.90
<br />AA-21
<br />DETECTABLE WARNING SURFACE
<br />SYS
<br />3.9
<br />$204.50
<br />$797.55
<br />AA-22
<br />CONCRETE WALK, REMOVE
<br />SYS
<br />39.7
<br />$44.00
<br />$1,746.80
<br />AA-23
<br />CONCRETE, REMOVE
<br />SYS
<br />68
<br />$40.90
<br />$2,781.20
<br />AA-24
<br />NOT USED
<br />NO BID
<br />NO BID
<br />AA-25
<br />CONCRETE CURB, 6 IN, REMOVE
<br />LFT
<br />46
<br />$38.00
<br />$1,748.00
<br />AA-26
<br />WOODEN STEPS, REMOVE
<br />LFT
<br />15
<br />$40.30
<br />$604.50
<br />AA-27
<br />WOODEN FENCE, REMOVE
<br />LFT
<br />34
<br />$17.50
<br />$595.00
<br />AA-28
<br />DECIDUOUS TREE, REMOVE
<br />EA
<br />16
<br />$875.00
<br />$14,000.00
<br />AA-2G
<br />NOT USED
<br />NO BID
<br />NO BID
<br />AA-30
<br />COMPACTED AGGREGATE No. 53
<br />CYS
<br />17
<br />$218.30
<br />$3,711.10
<br />ALTERNATE #2 - HILLSIDE AVENUE
<br />IttVeom
<br />Pay Item
<br />Unit
<br />Quantity
<br />PRICE
<br />ITEM PRICE
<br />AB-1
<br />MOBILIZATION, DEMOBILIZATION
<br />LS
<br />1
<br />$7,658.53
<br />$7,658.53
<br />AB-2
<br />CONSTRUCTION ENGINEERING
<br />LS
<br />1
<br />$4,700.00
<br />$4,700.00
<br />AB-3
<br />MAINTENANCE OF TRAFFIC
<br />LS
<br />1
<br />$4,634.00
<br />$4,634.00
<br />AB-4
<br />EROSION CONTROL
<br />LS
<br />1
<br />$2,051.95
<br />$2,051.95
<br />AB-5
<br />COMMON EXCAVATION
<br />CYS
<br />108
<br />$40.45
<br />$4,368.60
<br />AB-6
<br />PCCP FOR APPROACHES, 7 IN
<br />SYS
<br />32.1
<br />$92.90
<br />$2,982.09
<br />AB-7
<br />PCCP FOR DRIVEWAYS, 6 IN
<br />SYS
<br />27.6
<br />$112.40
<br />$3,102.24
<br />AB-8
<br />HMA, SURFACE, PG 58S-28, 9.5mm,
<br />TYPE B
<br />TON
<br />63.0
<br />$143.65
<br />$9,049.95
<br />AB G
<br />HMA, INTERMEDIATE, PG 58S-28,19.0
<br />mm, TYPE B
<br />TON
<br />103.0
<br />$102.80
<br />$10,588.40
<br />AB-10
<br />HMA BASE, PG 58S-28, 25.Omm, TYPE B
<br />TON
<br />164.0
<br />$100.55
<br />$16,490.20
<br />AB-11
<br />STORMWATER
<br />LS
<br />1
<br />$4,814.30
<br />$4,814.30
<br />AB-12
<br />MILLING, ASPHALT, 1.5IN
<br />SYS
<br />15
<br />$119.60
<br />$1,794.00
<br />AB-13
<br />CURB, CONCRETE, 6 IN
<br />LFT
<br />542
<br />$32.20
<br />$17,452.40
<br />AB-14
<br />SIDEWALK, CONCRETE, 4 IN
<br />SYS
<br />10.1
<br />$260.60
<br />$2,632.06
<br />AB-15
<br />TRANSVERSE MARKING, CROSSWALK
<br />LINE, 24IN
<br />LFT
<br />56
<br />$25.00
<br />$1,400.00
<br />AB-16
<br />SODDING, NURSERY
<br />SYS
<br />384
<br />$27.65
<br />$10,617.60
<br />AB-17
<br />ADJUST CASTING TO GRADE
<br />EA
<br />1
<br />$467.65
<br />$467.65
<br />AB-18
<br />ADJUST VALVE TO GRADE
<br />EA
<br />1
<br />$275.40
<br />$275.40
<br />AB-1G
<br />TACKCOAT
<br />TON
<br />0.2
<br />$935.95
<br />$187.19
<br />Version 1/3/2025 Contractor's Bid for Public Works -13