Laserfiche WebLink
INTER-OFFICE MEMORANDUM <br /> DEPARTMENT OF PUBLIC WORKS <br />DIVISON OF ENGINEERING <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk of the Board of Public Works <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: Agenda Request – Ratify Emergency Work <br />Emergency Sewer Repair at Western and Chapin <br />PO-0037116 <br />DATE: May 6, 2025 <br />The Division of Engineering and Division of Streets & Sewers requests the Board of Public <br />Works approval and ratification of an emergency purchase order contract with Selge <br />Construction Company, Inc. for a sewer collapse and repair at the intersection of Western <br />Avenue and Chapin Street. <br />This emergency work was identified by the Division of Streets & Sewers upon inspection of a <br />sinking pavement at the south leg of the intersection. Upon inspection, the sewer had debris <br />and sand indicating a sewer break. The root cause of this sewer break was identified as a fiber <br />optic cable that had been bored through the sewer pipe by Zayo Group (a fiber optic cable <br />company) that installed fiber optic cable along Western Avenue in late 2020, early 2021. <br />It is our recommendation that the Board of Public Works work with the Legal Department to file <br />a claim for the full amount of the emergency contractor’s invoice along with costs for City <br />personnel, equipment, engineering, and administration costs required to identify and manage <br />the repair. <br />Selge Construction was contracted on a time and materials basis for the emergency repair <br />work as they were available to perform the work after contacting multiple contractors about <br />availability. The contractor’s work included traffic control, pavement removal, replacement of <br />two sewer manholes, 36-inch diameter pipe, backfill, pavement restoration and specialty <br />crosswalk pavement and stamping. <br />Total Emergency Repair Cost: $220,379.51 <br />Attached is a breakdown of the costs associated with the repair work and subcontractor <br />invoices reflecting the costs incurred to perform this repair work. <br />Emergency Purchase Order PO-0036349 will be paid through Sewage Works Operations, <br />Other Contractual Services, Account 641-06-602-509-439001. <br />For questions regarding the subject Agenda Request or project scope of work, contact <br />Jacob M. Klosinski (Ext. 9496) at the Division of Engineering.