BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Addendum no. 2
<br />32.
<br />PCCP, Colored, 6"
<br />25
<br />SYD
<br />375.00
<br />$9,375.00
<br />33.
<br />PCCP for Approaches, 6"
<br />80
<br />SYD
<br />87.00
<br />$6,960.00
<br />34.
<br />PCCP for Approaches, 8"
<br />155
<br />SYD
<br />100.00
<br />$15,500.00
<br />35.
<br />D-1 Contraction Joint
<br />105
<br />LFT
<br />42.00
<br />$4,410.00
<br />36.
<br />Concrete Curb
<br />1,265
<br />LFT
<br />45.00
<br />$56,925.00
<br />37.
<br />OMITTED
<br />38.
<br />Concrete Curb and Gutter, Type B
<br />2,325
<br />LFT
<br />45.00
<br />$104,625.00
<br />39.
<br />Concrete Curb and Gutter, Depressed
<br />300
<br />LFT
<br />51.00
<br />$15,300.00
<br />40.
<br />Concrete Sidewalk, 4"
<br />1,700
<br />SYD
<br />77.00
<br />$130,900.00
<br />41.
<br />Concrete Curb Ramp
<br />250
<br />SYD
<br />150.00
<br />$37,500.00
<br />42.
<br />Concrete Curb Ramp, Colored
<br />140
<br />SYD
<br />150.00
<br />$21,000.00
<br />43.
<br />Detectable Warning Surface
<br />50
<br />SYD
<br />259.00
<br />$12,950.00
<br />44.
<br />Mulched Seeding. Type "U"
<br />8,400
<br />SYD
<br />6.00
<br />$50,400.00
<br />45.
<br />Sodding
<br />3,000
<br />SYD
<br />26.00
<br />$78,000.00
<br />46.
<br />Street Tree
<br />27
<br />EA
<br />695.00
<br />$18,765.00
<br />47.
<br />Storm Sewer Manhole, 48"
<br />16
<br />EA
<br />5,500.00
<br />$88,000.00
<br />48.
<br />Storm Sewer Catch Basin
<br />7
<br />EA
<br />5,140.00
<br />$35,980.00
<br />49.
<br />OMITTED
<br />50.
<br />OMITTED
<br />51.
<br />Storm Sewer Pipe, 12"
<br />1,193
<br />LFT
<br />49.00
<br />$58,457.00
<br />52.
<br />Storm Sewer Pipe, Water Main Grade, 12"
<br />44
<br />LFT
<br />90.00
<br />$3,960.00
<br />53.
<br />Storm Sewer Pipe, 18"
<br />583
<br />LFT
<br />60.00
<br />$34,980.00
<br />54.
<br />Storm Sewer Pipe, Water Main Grade, 18"
<br />75
<br />LFT
<br />108.00
<br />$8,100.00
<br />55.
<br />OMITTED
<br />56.
<br />OMITTED
<br />57.
<br />Underground Storm Sewer System
<br />1
<br />LS
<br />817,700.00
<br />$817,700.00
<br />58.
<br />Fire Hydrant, Assembly
<br />1
<br />EA
<br />16,100.00
<br />$16,100.00
<br />59.
<br />Water Main, 4"
<br />30
<br />LFT
<br />190.00
<br />$5,700.00
<br />60.
<br />Bend, 45 Degree, 4"
<br />4
<br />EA
<br />850.00
<br />$3,400.00
<br />61.
<br />OMITTED
<br />62.
<br />Adjust Casting to Grade
<br />8
<br />EA
<br />1,330.00
<br />$10,640.00
<br />63.
<br />Sheet Sign, 0.080 in.
<br />128
<br />SFT
<br />24.00
<br />$3,072.00
<br />64.
<br />Sheet Sign, 0.125 in.
<br />15
<br />SFT
<br />29.00
<br />$435.00
<br />65.
<br />Sign Post, Square, Type 2, Reinforced Anchor Base
<br />325
<br />LFT
<br />20.00
<br />$6,500.00
<br />66.
<br />Solar Powered Flashing Pedestrian Crossing Signage Assembly
<br />2
<br />EA
<br />12,000.00
<br />$24,000.00
<br />67.
<br />Lighted Bollard
<br />8
<br />EA
<br />5,000.00
<br />$40,000.00
<br />68.
<br />Line, Thermoplastic, Solid, White, 4"
<br />1,875
<br />LFT
<br />5.00
<br />$9,375.00
<br />69.
<br />Line, Thermoplastic, Solid, White, 4", Grooved
<br />880
<br />LFT
<br />6.00
<br />$5,280.00
<br />
|