Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: VPA LEEPER COURT RECONSTRUCTION <br />Project Number: 124-022 <br />For Bids Due: May 13, 2025 <br />Contractor Name: 6-r ko-4 Sa�s� Cenkms , za r <br />DIVISION A <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No.Amount <br />1 <br />Mobilization & Demobilization <br />1 <br />LSUM <br />$ 6 4 , 000. 00 <br />$64, 000. 00 <br />2 <br />Construction Layout and Survey <br />1 <br />LSUM <br />$20, 000 . 00 <br />$20, 000 . 00 <br />3 <br />Tree Protection <br />4 <br />EACH <br />$1, 0 0 0. 0 0$ <br />4, 0 0 0. 0 0 <br />4 <br />Temporary Const. Fence <br />1305 <br />LFT <br />$ 21 .84 <br />$ 2 8, 5 0 0 .0 0 <br />5 <br />Temporary Inlet Protection <br />9 <br />EACH <br />$ 5 5 5. 5 6 <br />$ 5, 0 0 0.0 0 <br />6 <br />Temporary Silt Fence <br />769 <br />LFT <br />$ 7. 2 3 <br />$ 5, 5 6 0. 0 0 <br />7 <br />Temporary Gravel Const. Entrance <br />72 <br />SYS <br />$19 2 .23 <br />$13 , 840.00 <br />8 <br />Remove Net Anchor <br />14 <br />EACH <br />$214 .29 <br />$3, 000.00 <br />9 <br />Remove Net Post <br />28 <br />EACH <br />$140 .36 <br />$3, 930.00 <br />10 <br />Fence and Gate Removal <br />1943 <br />LFT <br />$12 . 90 <br />$ 2 5 , 0 6 0 .0 0 <br />11 <br />Subbase Preparation <br />10236 <br />SYS <br />$12 . 6 7 <br />$12 9 , 6 7 0 .0 0 <br />12 <br />Compacted Aggregate No.53 <br />500 <br />1 TON <br />$ 51 . 0 0 <br />$ 2 5 , 5 0 0. 0 0 <br />13 <br />Sidewalk Removal <br />1296 <br />SYS <br />$18 . 11 <br />$ 2 3 , 4 7 0. 0 0 <br />14 <br />Full Depth Pavement Removal <br />9118 <br />SYS <br />$5 . 90 <br />$53, 790. 00 <br />15 <br />Concrete Sidewalk 4" <br />1370 <br />SYS <br />$10 3 . 7 8 <br />$14 2 , 17 0.0 0 <br />16 <br />Ribbon Curb, 2' <br />1058 <br />LFT <br />$ 3 8 . 11 <br />$ 4 0 , 310.00 <br />17 <br />Post -Tensioned Concrete <br />8866 <br />SYS <br />$111 . 8 5 <br />$ 9 91, 62 0 . 0 0 <br />18 <br />Chainlink Fencing, Complete <br />1889 <br />LFT <br />$103 . 07 <br />$194, 680 . 00 <br />19 <br />Chainlink Man Gate, 4' Width <br />7 <br />EACH <br />$1, 600.00 <br />$11, 200.00 <br />20 <br />Chainlink Man Gate, 8' Width <br />4 <br />EACH <br />$3, 000 . 00 <br />$12, 000. 00 <br />21 <br />Net Anchor <br />13 <br />EACH <br />$346. 16 <br />$4, 500.00 <br />22 <br />Net Post <br />26 <br />EACH <br />$ 3 41 . 16 <br />$ 8 , 870. 00 <br />23 <br />Tennis Court Net <br />13 <br />EACH <br />$384 . 62 <br />$5, 000.00 <br />Version 1/3/2025 Contractor's Bid for Public Works - 7 <br />