Laserfiche WebLink
A/E' s REVIEW AND ACTION <br />Substitution approved - Make submittals in accordance with Specification Substitution Procedures. <br />Substitution approved as noted - Make submittals in accordance with Specification Substitution Procedures. <br />Substitution rejected - Use specified materials. <br />Submitted by:Paulette Hogan <br />Signed by:Paulette Hogan <br />Firm:ICP Building Solutions Group <br />Address: <br /> , MA <br />Telephone:, phogan@icpgroup.com <br />The Undersigned certifies: <br />Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product. <br />Same warranty will be furnished for proposed substitution as for specified product. <br />Same maintenance service and source of replacement parts, as applicable, is available. <br />Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule. <br />Proposed substitution does not affect dimensions and functional clearances. <br />Proposed Substitution:Plexipave <br />Manufacturer:ICP Building Solutions Group Corporate HQ: <br />150 Dascomb RD. <br />Andover, MA 01810 Phone: (800) 225-1141 <br />Trade Name:Plexipave Model No.: N/A <br />Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of <br />the request; applicable portions of the data are clearly identified. <br />Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper <br />installation. <br />Specification Title: <br />According to 'For the Love of Leeper Park' <br />committee member,Darla Lippert, this project <br />will require $1.5 million worth of funding. The <br />plans call to completely replace the tennis <br />courts and potentially add a clubhouse to <br />make South Bend a destination pl <br /> <br />Description:According to 'For the Love of Leeper Park' co <br />Section:Page: Article/Paragraph: <br />Project:VPA Leeper Tennis Courts Reconstruction <br /> Substitution Request <br />Number:Spec-0064044 <br /> South Bend, IN From:Paulette Hogan, ICP Building Solutions Group <br />To:Theresa Heffner , City of South Bend Date:04/14/2025 <br /> bpwbids@southbendin.gov, 5742359251 A/E Project Number: <br />Re: <br />According to 'For the Love of Leeper Park' <br />committee member,Darla Lippert, this project will <br />require $1.5 million worth of funding. The plans <br />call to completely replace the tennis courts and <br />potentially add a clubhouse to make South Bend <br />a destination pl <br /> <br />Contract For:City of South Bend <br />SUBSTITUTION REQUEST <br />(During the Bidding/Negotiating Stage) <br />