Laserfiche WebLink
REGULAR MEETING APRIL 22, 2025 94 <br />OPENING OF BIDS — WASTEWATER TREATMENT PLANT WAS THICKENING <br />IMPROVEMENTS — PROJECT NO. 123-031B (PR -SEWAGE WORKS CAPITAL 642-06-605- <br />514-442005) <br />This was the date set for receiving and opening sealed bids for the above referenced project. The <br />Clerk tendered proof of publication of the Notice in the South Bend Tribune, which was found to <br />be sufficient. The following bids were opened and publicly read: <br />BOWEN ENGINEERING CORPORATION <br />8802 N. Meridian St. <br />Indianapolis, IN 46260 <br />stout(a�bowenen ing Bering com; matthew.carlin(a�bowenen ing Bering com <br />Bid was signed by Mr. Doug Stout <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />One (1) of One (1) Addendum(s) Acknowledgement received. <br />an <br />Base Bid <br />$4,756,000 <br />Alternate 1 <br />N/A <br />Alternate 2 <br />N/A <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />bids were referred to Public Works for review and recommendation. <br />OPENING OF BIDS — GRAND TRUNK WESTERN RAILROAD WATER MAIN <br />REPLACEMENT AT GREENLAWN AVE. & 30TH ST. — PROJECT NO. 122-041 (PR- <br />00033297 <br />This was the date set for receiving and opening sealed bids for the above referenced project. The <br />Clerk tendered proof of publication of the Notice in the South Bend Tribune, which was found to <br />be sufficient. The following bids were opened and publicly read: <br />NO BIDS RECEIVED <br />AWARD BID AND APPROVE CONTRACT — 2025 STREET AND SEWER MATERIAL BIDS <br />— PROJECT NO. 125-005 (PR-00039711) <br />Mr. Dan Jones, Engineering, advised the Board that on April 8, 2025, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Jones recommended that <br />the Board award the contract to the lowest responsive and responsible bidders, Smith Ready Mix <br />- Division A: Rieth-Riley Construction Co., Inc. — Division B, Item B-1: Division B, Item B-2, no <br />bids received, City recommendation to proceed to open market: Klink Trucking Inc. - Division B, <br />Items B-3, B-4 and B-6: Penn Soils LLC — Division B, Item B-5: BUC Construction Supply, Inc. <br />- Division C, American Highway Products - Division D: Division E - No bids received, will <br />proceed; City recommendation to proceed to open market: K-Tech Specialty Coatings - Division <br />F: Bit- Mat Products of Indiana - Division G, Items G-1 and G-2: Division G, Item G-3 — No bids <br />received, will proceed; City recommendation to proceed to open market. Therefore, VP Molnar <br />made a motion that the recommendation be accepted, and the bid be awarded, and the contract <br />approved as outlined above. Mr. Miller seconded the motion, which carried by roll call. <br />AWARD BID AND APPROVE CONTRACT — 2025 ASPHALT MATERIAL BID — PROJECT <br />NO. 125-006 (PR-00039712) <br />Mr. Dan Jones, Engineering, advised the Board that on April 8, 2025, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Jones recommended that <br />the Board award the contract to the lowest responsive and responsible bidder, Milestone <br />Contractors L.P., in the amount of $3,320,625 (Unit Pricing). Therefore, VP Molnar made a motion <br />that the recommendation be accepted, and the bid be awarded, and the contract approved as <br />outlined above. Mr. Miller seconded the motion, which carried by roll call. <br />