Laserfiche WebLink
Edison Sundown Annexation Area 6 <br /> <br /> <br /> <br />SECTION III. MUNICIPAL SERVICES <br /> <br />A. Public Works <br /> <br />Sewer – The nearest available public sewer is on Ardmore Trail. The sewer cannot be <br />extended without approval from the Board of Public Works, including conformance with <br />Resolution 17-2021 on Sewer and Water Extension Policy for Areas Outside of the City Limits. <br />St. Joseph County approval would also be required to extend utilities along St. Joseph County <br />right of way. Any extension of sewer is the sole expense of the developer. <br /> <br />Water - The nearest water line is located north of the edge of pavement in the Edison Road <br />right of way. The line is a 16” ductile iron main. There is a pressure regulating valve and one <br />hydrant along this main. A Utility Verification Form and System Development Charges would be <br />required to connect to the existing water main. <br /> <br />Extensions of or taps into sanitary sewer and water lines shall be governed by state law and <br />the rules and regulations of the South Bend Water Works and Sewer Utility. The Annexation <br />Area may be subject to system development charges for both water and sewer services. <br /> <br />Development of the site requires development of a Drainage Plan. No public storm sewer is <br />available to the site. Retention basins and low impact means to promote infiltration of <br />surface water will be required. The developer will also be required to generate an erosion <br />control plan and obtain a permit. <br /> <br />Subdivision of land will require minimum frontage on public rights-of-way to current standards, <br />or to development standards adopted for this development that meet or exceed the Zoning <br />Ordinance and the Standards for Design and Construction. <br /> <br />Streets –Upon annexation, 726 feet of Edison Road will be added to the City. A City permit will <br />be needed to add or change driveway access to the property. A portion of the St. Joseph <br />Valley Parkway will also be added, but it will continue to be maintained by INDOT. The <br />developer may be required to build public sidewalk as part of the development process. <br /> <br />Street Lighting – There is no street lighting on Edison Road. No additional street lighting is <br />necessary for this annexation area. Should any additional street lighting be desired, it can be <br />provided on wood poles with overhead wiring through an ongoing contract with Indiana <br />Michigan Power. <br /> <br />Waivers of Annexation – No waiver of annexation is in effect for this area. <br /> <br /> <br /> <br /> <br /> <br />