My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Wastewater Treatment Plant WAS Thickening Improvements Proj No 123-031B - Bowen Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Wastewater Treatment Plant WAS Thickening Improvements Proj No 123-031B - Bowen Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 2:40:21 PM
Creation date
4/22/2025 2:39:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EQUIPMENT QUESTIONNAIRE <br />CITY OF SOUTH BEND <br />Project Name: South Bend WWTP WAS Thickening Improvements <br />Project Number: 123-031B <br />For Bids Due: April 22, 2025 <br />Contractor Name: <br />Version 5/20/2024 Contractor’s Bid for Public Works - 8 <br />The Bidder shall enter in the spaces provided the names of the manufacturers of equipment which Bidder <br />proposes to furnish and shall submit this Equipment Questionnaire with its Bid. Owner will review and <br />evaluate the information before award of the Contract. <br />Only one manufacturer's name shall be listed for each item of equipment. Upon award of a contract, the <br />named equipment shall be furnished. Substitutions will be permitted only if named equipment does not <br />meet the requirements of the Contract Documents, the manufacturer is unable to meet the delivery <br />requirements of the construction schedule, or the manufacturer is dilatory in complying with the <br />requirements of the Contract Documents. Substitutions shall be subject to concurrence of Owner and <br />shall be confirmed by Change Order. <br />Preliminary acceptance of equipment listed by manufacturer's name shall not in any way constitute a <br />waiver of the specifications covering such equipment; final acceptance will be based on full conformity <br />with the Contract Documents. <br />Failure to furnish all information requested or entering more than one manufacturer's name for any item in <br />this Equipment Questionnaire may be cause for rejection of the Bid. <br />Equipment Manufacturer <br />1. 600 Volt Class Motor Control Centers ___________________________________ <br />2. Air-Operated Diaphragm Pumps ___________________________________ <br />3. Dry Polymer Feed System ___________________________________ <br />Bowen Engineering Corporation <br />Addendum No. 1 Removed Equipment item 1 <br />FLSmidth <br />Cleanwater1
The URL can be used to link to this page
Your browser does not support the video tag.