My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - South Well Field Water Plant Improvement, Bid Package 2 Proj No 117-059A - R Yoder Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - South Well Field Water Plant Improvement, Bid Package 2 Proj No 117-059A - R Yoder Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 2:37:49 PM
Creation date
4/22/2025 2:37:39 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> www.ryoderconstruction.com <br /> Page | 1 <br /> <br />SOUTH WELL FIELD, WATER TREATMENT PLANT <br />AND DISTRIBUTION SYSTE M IMPROVEMENTS <br />CONTRACT A WELL FIELD AND WATER TREATMENT <br />PLANT IMPROVEMENTS (BID PACKAGE 2A) <br /> <br /> <br /> <br /> <br /> <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br /> <br /> <br />1. Comply with schedule to begin and complete as stated in contract using necessary <br />equipment and manpower to complete. We have a team of tradesmen fully capable of <br />completing project on schedule and on budget. <br /> <br />2. Griffen Plumbing & Heating, 2310 Toledo Rd., Elkhart, IN 46514 Plumbing & Heating <br />Schwartz Electric, Inc., 313 E. Waterford St., Wakarusa, IN 46573 Electrical <br />Interior Finishes, Inc., 3601 W. McGill St., South Bend, IN 465628 Flooring <br />Middlebury Electric, Inc., 65725 US 33, Goshen, IN 46526 Industrial Electrical <br />Edward J. White, Inc., 1011 S. Michigan St., South Bend, IN 46601 - HVAC <br /> <br />3. A list of subcontractors will be submitted if awarded the bid. We do not require a bond <br />from sub-contractors. <br /> <br />4. We have or have access to all the equipment necessary to complete the project. <br /> <br />5. Yes, we have received proposals from subcontractors.
The URL can be used to link to this page
Your browser does not support the video tag.