My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Gateway S. Michigan-S. Main Comm. Corridor Action Plan 1998
sbend
>
Public
>
Archived Plan Documents
>
South Gateway S. Michigan-S. Main Comm. Corridor Action Plan 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 9:50:24 AM
Creation date
4/22/2025 9:49:35 AM
Metadata
Fields
Template:
Dept of Community Investment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phase 3: 2000 - 2005 <br />4. Establish landscaped parkways <br />City of South <br />As <br />$ 75,000- <br />• Remove paving between curb and sidewalk <br />Bend <br />development or <br />$85,000 <br />• Install street trees and grass <br />major roadway <br />(8,500 per <br />reconstruction <br />block face) <br />occurs <br />5. Develop a banner program <br />Steering <br />winter, 2000 <br />$20,000- <br />• Cluster banners at key locations such as near signalized intersections <br />Committee/ City <br />$40,000 <br />• Work with businesses and residents to determine if permanent or <br />of South Bend/ <br />($740 per <br />changeable banners are preferred <br />Power Company <br />banner) <br />• If changeable banners are used, consider utilizing banners with South <br />Gateway logo and identification of a contributing local business <br />6. Develop enhanced streetscape at key signalized intersections <br />Steering <br />1999 - 2005 <br />Per <br />• Add pedestrian scale lighting, enhanced sidewalk paving, and street <br />Committee/ City <br />streetscape <br />trees <br />of South Bend <br />plans <br />• Continue streetscape treatment along east/west roadways <br />• Establish varying levels of improvement based on the amount of <br />pedestrian traffic, with greatest level of improvements along 200 <br />Michigan <br />7. Encourage businesses to establish a common awning program <br />Business <br />1999-2005 <br />• Basic shape and form should be consistent, ideally extending <br />owners/ <br />approximately 3' to 4' out from building to provide limited shelter from rain <br />Steering <br />• Encourage consistent awning color at intersections <br />Committee <br />• Encourage common purchase through a single vendor <br />8. Encourage 1950's style sign theme for private businesses <br />Business <br />1999-2003 <br />• Maintain scale of signs consistent with use <br />owners/ <br />• Encourage signs with unique shape <br />Steering <br />• Provide greater latitude for sign variations where consistent with desired <br />Committee/City <br />corridor theme <br />of South Bend <br />9. Extend Studebaker Corridor Design Guidelines and design review to <br />Steering <br />1999+ <br />commercial and industrial development within the South Gateway <br />Committee/ City <br />Commercial Corridor along Michigan and Main <br />of South Bend <br />Business Districts, /nc. <br />South Gateway Commercial Corridor Action Plan <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.