|
it o . I k. 3'F M . i
<br />ISSUEDRY
<br />INDIANAPOLIS, IN March 14, 2025
<br />TO
<br />RIETH-RILEY CONSTRUCTION CO., INC. GOSHEN, IN
<br />who has filed with the Department a Contractor's Statement of Expeflence and Financial Gonditton as
<br />raqutred under In d ana Code 8 23 10, is hereby qualified tc b(d at any liepsrtment of 7ransportatlon
<br />reiting In Glasses of Work and within fhe amount and Other limitation of each olass(firtion as listed
<br />below, fcx such pem6 as the tgtoompla#ed"* on hand from allsourc ea doas hctaxoeed theAggrM
<br />amount Classlf€atlon ratereroes by name orsymIm ace in eummanoe with tfte definitl€m in the
<br />odrmtoraStatemant taf xperlaweandnnancialionditbn. ibis€ehifcatesupersedmany€erfi €ate
<br />Pwicuety issued, but is subject to revision or ravocat�n acroMing to the Iaw, if and when changes
<br />n fhe fln hctat €ondition of fha contracting firm or other facts justify such revision or revocation,
<br />Valid March 14, 2025 Thru July 31, 2025
<br />Aggregate Bidding Capacity: 2,105,810,000.0
<br />0085 CLEAN AND SEAL CRACKS /JOINTS IN PCCPIHMA PVMT..........................................
<br />$10,000,000.00
<br />0135 EARTH RETENTION SYSTEMS: GENERAL....................................................................
<br />$10,000,000.00
<br />0155 TEMPORARY EROSION AND SEDIMENT CONTROL ....................................................
<br />$10,000,000.00
<br />0250 DRIVEN PILING.................................................................................................................
<br />$10,000,000.00
<br />0333 SOUND BARRIER WALL INSTALLATION........................................................................
<br />$10,000,000.00
<br />0400 WATERAND WASTEWATER TREATMENT SYSTEMS ...................................................
<br />$20,000,000.00
<br />A(A) CONCRETE PAVEMENT: GENERAL................................................................................
<br />$99,999,999.00
<br />B(A) ASPHALT PAVEMENT: W/INDOT CERTIFIED HMA PLANT .............................................
<br />$99,999,999.00
<br />C(A)HEAVY GRADING..............................................................................................................
<br />$99,999,999.00
<br />D(A) HIGHWAY OR RAILROAD BRIDGE OVER WATER..........................................................
<br />$99,999,999.00
<br />D(B) HIGHWAY OR RAILROAD BRIDGE OVER HIGHWAY .....................................................
<br />$99,999,999.00
<br />D(C) HWY/RR BRIDGE REQ RR TRACK PROTECTION.........................................................
<br />$99,999,999.00
<br />E(C) BRIDGE DECK OVERLAY AND MINOR BRIDGE REPAIR ...............................................
<br />$10,000,000.00
<br />E(E) SMALL STRUCTURES AND DRAINAGE ITEMS..............................................................
<br />$10,000,000.00
<br />E(F) SURFACE MASONRYAND MISCELLANEOUS CONCRETE ...........................................
<br />$99,999,999.00
<br />E(H) DEEP SEWER AND/OR EXCAVATION..............................................................................
<br />$99,999,999.00
<br />E(R) ASPHALT PAVEMENT MILLING.......................................................................................
<br />$99,999,999.00
<br />E(T) DEMOLITION......................................................................................................................
<br />$99,999,999.00
<br />COMMISSIONER
<br />31u4 Fw 2WO8 ou is-"
<br />
|