Laserfiche WebLink
ate Himick <br />Historic Preservation Specialist <br />Department of Community Investment <br />Office: (574) 235-7478 <br />khimick@southbendin.gov <br />City of South Bend <br />227 W. Jefferson Blvd., Ste. 1400 S <br />South Bend, IN 46601 <br />http://www.southbendin.gov/hpc <br />  <br />  <br /> <br />From: Josh Fairchild <joshf@callamnow.com> <br />Sent: Monday, February 24, 2025 11:23 AM <br />To: Kate Himick <Khimick@southbendin.gov>; Kenny Stevens <stevens@callamnow.com>; <br /> <br />Subject: COA for 505 N Lafayee Blvd <br /> <br />Good morning, Included are brochures for the products we will be using to repair the home on the <br />front 2nd story eave. <br />  <br />The scope of work includes- <br />              Removing the previous shingles, flashings, and underlayment’s from the eave of the roof to <br />the valley end. This is where the fascia on the dormers meets the roof line. <br />              Remove the previous asphalt shingles from the eave to valley and on the dormer side walls. <br />(see provided photos) <br />              Installing new drip edge, ice and water shield on the roof eaves and side walls. <br />              Installing new Owens corning estate gray shingles. This is a best matched shingle for the <br />repair. <br />              Install L flashings and end wall flashings where the dormer meets the roofline. These flashings <br />will replace the previous steel flashings that have corroded. The new flashings will be a white <br />aluminum. <br />              Install mastic D4 vinyl siding on the dormer side walls. The color will be white to match the <br />trims and fascia on the dormers. <br />